The City of Duluth is preparing for the reconstruction of 1st Avenue East between East Superior Street and East 3rd Street that will take place in 2023. This reconstruction will replace the existing road surface and sidewalks for the full road width as well as the steam, hot water, and water utilities beneath the road. Traffic signals at the intersection of East 2nd Street and 1st Avenue East will be replaced. The existing street lights will be replaced during the project as well. Design engineering will be conducted by LHB Corp. and overseen by the City of Duluth. This project will be financed by the City of Duluth through Minnesota State Aid for Streets funds.