Bids & Request For Proposals
The City of Duluth uses the Bid Express® electronic bidding platform to provide proposals, plans and specifications and to receive sealed bids for construction projects and large commodity purchases. To view and download bid packages and plans on their website, visit https://www.bidexpress.com and search for "City of Duluth" or the bid number. You must register for a free account to browse the site and search for advertisements.
Bid openings for sealed bid solicitations will be live-streamed using the links listed below.
UPCOMING BID OPENINGS:
No bid openings at this time
Click Here to get on a Plan Holder's List
- 23-99655 RFQ for Site Assessment & Evaluation for Solar PV & Storage (due 11/13)
- 23-99646 St. Andrews Bridge Project (due 10/11)
- 23-99682 Tree Clearing Services for Nordic Trail at Spirit Mountain (due 10/6)
- 23-AA11 DEDA RFP for Lester Development (Due 10/3)
- 23 AA11 DEDA RFP For Lester Development
- Appendix A Proposal Cover Sheet
- Appendix B Site Location Maps
- Appendix C Imagine Duluth 2035 Comprehensive Plan
- Appendix D Council Ordinance 21 069 O Conveyance
- Appendix E Development Agreement City DEDA
- Appendix F Land Survey
- Appendix G Maxfied Research Housing Study
- Appendix H Wetland Delineation Report
- Appendix I Phase I Environmental Site Assessment
- Appendix J Lester Golf Land Appraisal, 07312023
- Addendum 1 To 23 AA11 9.25.23
- 2023 RFPs and Bids
- 23-AA01 Water Treatment Chemicals (Due 12/6)
- 23-0002 Hot Water Pipe Materials (due 1/11)
- 23-4401 Request for Qualifications for Airport Consultant Services (due 1/20/23)
- 23-AA03 RFP for Design Services at Main Library (due 1/27)
- 23 AA03 RFP For Design Services At Library W Appendix A And I
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Appendix F
- Appendix G
- Appendix H
- Site Visit Sign In Sheet
- Addendum 1 To 23 AA03
- Main Library Blueprint Achitectual Drawings
- Main Library Blueprint Electrical Drawings
- Main Library Blueprint Fire Alarm & Security
- Main Library Blueprint Interior Furnishings
- Main Library Blueprint Mechanical
- Main Library Blueprint Sprinkler System
- Main Library Blueprint Structural
- Addendum 2 To 23 AA03
- 23-AA04 RFP for Community Engagement Services for Library Building Redesign (due 1/27)
- 23-99029 RFP for Engineering Svcs for Irving Park Bio-Filtration Basin (due 1/27)
- 23-99135 Library-Depot Parking Facility Structural Repairs (due 2/14)
- 22-99784 City Hall Grounds Improvements (due 3/2)
- 23-99250 2023 Gas Blanket Project (due 3/2)
- 23-4403 Construct Ranch Hangar at Duluth International Airport (due 3/2)
- 23-99265 RFP for Equity Action Team Strategic Planning (due 3/13)
- 23-0113 2023 Insulating of Manholes (due 3/14)
- 23-99308 Lincoln Park Signage (due 4/6)
- 23-0285 Harborview Building Steam to Hot Water Conversions (due 4/11)
- 23-99147 Enger Park Golf Course Pump Station (due 4/18)
- 23-99146 Enger Golf Course Electrical Supply (due 4/18)
- 23-99145 Enger Golf Course Irrigation Improvements (due 4/18)
- 23-99144 Enger Golf Course Improvements-Earthwork (due 4/18)
- 23-99307 Hot Mix Bituminous for Patching for 2023 (Due 4/19)
- 23-4404 Request for Qualifications for Professional Airport Consulting Services (due 4/21)
- 23-99336 1st Avenue East Reconstruction Project 2100 (due 4/27)
- 23-99317 CIPP Sanitary Lining Project (due 5/10)
- 23-99392 2023 Street Preservation (Due 5/11)
- 23-AA05 Tree Growing Contract (due 5/11)
- 23-4406 Request for Qualifications for Airport Consulting Srvs for Airline Use and Lease Agreement (Due 5/9)
- 23-4405 DIA Taxiway C North Rehabilitation (Due 5/12)
- 23-AA06 Steel Materials for Seawall Reconstruction (Due 5/23)
- 23-4407 Request for Qualifications for Airport Marketing & Advertising Svcs (due 5/25)
- 23-99414 Brighton Beach Resiliency Plan - Landscape & Shoreline Restoration Work: Phase 2 (5/31/23)
- 23-99427 3rd Street Reconditioning (due 5/31)
- 23-99318 CIPP Storm Lining Project - City Wide (Due 5/31)
- 23-99421 RFP for Design Services for Lakewood Water Treatment Plant Standby Power (Due 5/31)
- 23-AA09 RFP for Lester Property Appraisal (due 6/1)
- 23-99452 Devonshire Street Reconstruction and Safe Routes to School (Due 6/2)
- 23-4408 Reconstruct Sky Harbor Airport Terminal (due 6/8)
- 23-AA10 RFP for Municipal Advisor Services (due 6/9)
- 23-99455 2023 Citywide Utility Patch and Sidewalk (Due 6/14)
- 23-4402 Construct Sky Harbor Airport SRE Building (due 6/22)
- 23-AA08 Request for Information Marketing Partners for Small Businesses (Due 7/7)
- 23-4409 DIA Taxiway A Reconstruction - Phase 3 (due 7/11)
- 23-99386 RFP SOGL Invasive Species Control (due 7/12)
- 23-99532 RFP for Design Services for Campus Connector Segment 4 & 5 (due 7/26)
- 23-99533 RFP for Design Services for Campus Connector Segment 6 (due 7/26)
- 23-99150 Spirit Mountain Legacy - Phase I - Mountain Bike Trails
- 23-99564 RFP for Environmental Assessment Worksheet for Central High School Site Redevelopment (due 8/7)
- 23-0471 Zenith Building Steam to Hot Water Conversion
- 23-99547 RFP for Additional Pump for Spirit Mountain Pump House
- 23-AA07 Duluth Coastal Infrastructure Rehabilitation Project (Due 8/23)
- 23-99593 RFP Eng Svc for Duluth Heights Storm Water Study and Eklund Ave Reconstruction (due 8/29)
- 23-99588 Spirit Mountain Trail - Phase 1 Knowlton Creek Bridge Abutments (due 8/30)
- 23-99597 Canal Beach 2022 Storm Repairs (Due 8/31)
- 23-99643 Congdon Boulevard 2022 Storm Repair
- 23-99641 Shoreline Rehabilitation Between 3rd Ave. E. and 4th Ave. E. (due 9/27)
- 23-99649 RFP for Engineering Svcs for 2024 Street Preservation (due 9/26)
- 2022 RFPs and Bids
- 22-99042 USCBP Cruise Facility
- 22-99072 Hydrants and Valves
- 22-AA02 RFP Environmental Assessment Brighton Beach
- 22-99246 2022 Gas Blanket Project for Mains & Services - City Wide
- 22-5501 RFP for Design Services for Spirit Mountain Chalet
- 22 5501 RFP For Spirit Mtn Rec Area Chalet Design
- Appendix B Spirit Mtn Pre Design Report From TKDA
- Appendix C Bond Application
- Appendix D Spirit Mtn Task Force Recommendations
- Appendix E Building Owner Performance Requirements
- 22 5501 Planholder's List 02.23.2022
- Addendum 1 To 22 5501
- Addendum 2 To 22 5501
- 22-5503 RFP for Construction Manager for Spirit Mountain Renovations
- 22-4401 DLH Runway Lighting and Signage
- 22-99281 Traffic Signal Poles
- 22-AA06 RFP for Mixed-Use Woodland Development
- 22-99292 Hot Mix Blacktop for Patching for 2022
- 22 99292 Invitation To Bid And Instructions
- Bid Tabulation 22-99292
- 22-99127 2022 Citywide Utility Patch and Sidewalk
- 22-99310 RFP for Engineering Services for East 3rd St Reconditioning
- 22-4404 Sky Harbor Airport Apron Rehabilitation
- 22-AA08 RFP for Golf Course Operator
- 22-4405 Request for Qualifications for Development of Airline Use and Lease Agreement
- 22-0307 RFP for Intro to Healthcare Careers Facilitator
- 22-AA12 2022 Grass Cutting
- Region 1
- 1 Region Overview 3.28.22
- 1 3&4 2022 Scenic Outlook 1 2
- 1 5 2022 Scenic Outlook 3
- 1 6 2022 Scenic Outlook 4
- 1 7 2022 Scenic Outlook 5
- 1 8&9 2022 Scenic Outlook 6 7
- 1 10 2022 Scenic Outlook 8
- 1 11 2022 Scenic Outlook 9
- 1 12 2022 Russell Square
- 1 14 2022 Tourist Info Center
- 1 24 2022 Kelso Park
- 1 25 2022 47Th Avenue And London Road
- 1 26 2022 Grosvenor Square
- 1 27 2022 57Th Avenue And Tioga Street
- 1 28 2022 University Park
- Region 2
- Region 3
- Region 3B
- Region 4
- Region 5
- 22 AA12 Planholder List 04.04.22
- Quote Form
- Bid Summary 22 AA12 Grass Cutting
- Region 1
- 22-99297 21st Ave East Rehabilitation
- 22-0332 Duluth Energy Systems 2022 Manhole Repairs
- 22-0336 Zeitgeist Building Conversion - Gas to Hot Water
- 22-5504 RFP for Developer for Pastoret Terrace Historic Restoration
- 22-5501 REBID RFP for Spirit Mountain Chalet Design Services
- 22 5501 REBID RFP For Spirit Mountain Chalet Design Services
- Appendix B Spirit Mtn Pre Design Report From TKDA
- Appendix C Bond Application
- Appendix D Spirit Mtn Task Force Recommendations
- Appendix E Building Owner Performance Requirements
- Pre Bid Meeting Sign In Sheet 04.07.22
- Addendum 1 To 22 5501
- Planholder's List 04.14.2022
- Addendum 2 To 22 5501 REBID
- 22-AA13 RFP for Design Services for Spirit Mountain Grounds and Amenities
- 22 AA13 RFP For Design Services For Spirit Mountain Grounds And Amenities
- Appendix C Bond Application
- Appendix D Spirit Mtn Task Force Recommendations
- Appendix E Building Owner Performance Requirements
- Appendix B Spirit Mtn Pre Design Report From TKDA
- 22 AA13 Planholder's List 04.05.22
- Addendum 1 LOCATION OF PRE BID MEETING
- Addendum 2 PRE BID MEETING AND SCHEDULE CHANGE
- Pre Bid Meeting Sign In 22 AA13 04 14 22
- 22-99343 Hidden Valley Phase 2 Water Main and Street Preservation
- 22-99366 RFP for Engineering Services for Raleigh Street Reconstruction
- 22-AA09 RFP for Concessionaire for Wheeler Softball Complex
- 22-99368 2022 Street Preservation
- 22-99358 East 1st Street and East 1st Street Alley Reconstruction
- 22-AA11 RFP for Professional Services for a Racial Bias Audit
- 22-99382 Lead Water Service Replacement - Phase 1
- 22-AA06 REBID RFP for Mixed-Use Woodland Development
- 22-99412 Variable Refrigerant Flow Equipment Package
- 22-99400 Lift Station 17 generator and Control Panel
- 22-99384 Michigan Street Utility Reconstruction
- 22-99413 Air Handling Units, Fluid Cooler and Air-Cooled Heat Pump Equipment
- 22-4407 Demolition of Hangar 101
- 22-0346 RFP for Older Worker Digital Literacy Training
- 22-4406 Request for Qualifications Construction Manager as Adviser Services
- 22-99411 Bridge Repair and Retaining Wall Restoration - Skyline Parkway
- 22-99418 City Hall MEP Renewal Construction
- Invitation For Bid 22 99418
- Pre Bid Meeting Sign In Sheet 22 99418
- Addendum 1 To 22 99418
- Addendum 2 To 22 99418
- Addendum 3 To 22 99418 (Reduced File Size)
- Addendum 4 To 22 99418
- Addendum 5 To 22 99418
- Addendum 6 To 22 99418 BID DEADLINE EXTENDED
- Addendum 7 CORRECTED BID DEADLINE JUNE 14
- Bid Summarysolicitation 22 99418
- 22-5505 Chester Bowl Bridge Abutment and Grading
- 22-5506 Chester Ski Bridge Timber Package
- 22-5507 Chester Ski Bridge Steel Package
- 22-AA10 Accepting Bids to Purchase and Harvest Timber
- 22-99435 RFP for Library Security Assessment
- 22-99485 East 1st Street Sanitary Sewer Extension
- 22-99467 RFP for Stormwater Management Plan 2022
- 22-99498 RFP Construction Inspection Services for 2022 City Wide CIPP Project (Due 6/29)
- 22-99349 Lakewalk Shoreline Rehabilitation Sites B & C (Due 7/6)
- 22-99501 Marten Trail and Shoreline Rehabilitation (Due 7/6)
- 22-99418 REBID City Hall MEP Renewal Construction (Only Work Scope 1 General Conditions) (Due 7/6)
- 22-0307 REBID RFP Intro to Healthcare Careers Consultant (Due 6/30)
- 22-4408 DAA Parking Technology System Upgrade (Due 7/19)
- 22-99539 Step Van (Due 7/28)
- 22-99533 Lincoln Park Site Improvements (Due 8/3)
- 22-4402 Reconstruction of Taxiway A and Repair Midfield Ramp (Due 8/4)
- 22-99573 2022 Lead Water Service Replacement - Phase 2 (Due 8/5)
- 22-99568 2022 Citywide CIPP Lining (Due 8/10)
- 22-99540 Demolition 417 E 4th St (Due 8/10)
- 22-99541 Structure Demolition City of Duluth (due 08/10)
- 22-4409 Professional Security Services DAA (Due 8/23)
- 22-99574 RFP for Engineering Services for City-Wide Lead Water Service Replacement (due 8/24)
- 22 99574 RFP For Engineering Services For City Wide Lead Water Service Replacements Corrected
- Addendum 1 To 22 99574
- Addendum 2 To 22 99574
- Appendix B Federal Supplemental Provisions
- Appendix C Byrd Anti Lobbying Certificate
- Addendum 3 To 22 99574
- Pre Proposal Meeting Sign In Sheet 8.11.22 22 99574
- Planholder's List 22 99574 08.12.22
- Addendum 4 To 22 99574
- 22-AA16 RFP for Downtown East Redevelopment with Ramps (Due 8/25)
- 22-99618 Brighton Beach Shoreline Stabilization (due 8/31)
- 22-99385 City Hall Grounds Improvements (Due 8/31)
- 22-0307 2ND REBID RFP Intro to Healthcare Careers Consultant (Due 8/31)
- 22-99638 RFP Engineering Services For Devonshire St Reconstruction From Atlantic Ave Westerly And Lincoln Park Safe Routes To School Improvement (Due 9/9)
- 22-99637 RFP Engineering Services For Chester Park Drive Alley (17th Ave E to 18th Ave E) (due 9/9)
- 22-99632 RFP Engineering Services for 1st Ave East (Superior St to 3rd St) (due 9/12)
- 22-99650 Building Demolition 2228 Ensign St.
- 22-99418 2nd REBID City Hall MEP Renewal General Conditions Workscope
- 22-5504 REBID RFP for Developer for Pastoret Terrace Historic Restoration (due 9/30)
- 22-99418 3rd REBID General Conditions Workscope for City Hall MEP Renewal
- 22-99705 Lincoln Park Historic Pavilion Renovation (Due 10/26)
- 22-99753 Valves & Hydrants for 2023 Projects (Due 11/3)
- 22-99759 Brass Water Service Fittings for 2023 Projects (Due 11/9)
- 22-99740 RFP for Engineering Services for West Superior St Design (Carlton St. to W. Michigan St.) (Due 11/23)
- 22-AA10 REBID Timber Harvest (Due 11/29)
- 22-99763 Ash Tree Removal in Boulevards West of Mesaba (due 11/30)
- 23-AA02 RFP for Energy Assessments & Conservation Services (Due 11/30)
- 22-99767 RFP for Hillside Creek Tunnel Inspection (Due 11/30)
- 22-99790 RFP for Engineering Svcs for Chester Creek Culvert Replacements (due 11/30)
- 22-AA18 RFP for HART District Ramp Lease (Due 12/1)
- 22-99747 Enger Golf Course Improvements (due 12/2)
- 2021 RFPs and Bids
- 21-0076 2021 DES Manhole Repairs
- 21-99112 2021 Citywide Patch & Sidewalk
- 21-AA06 RFP for Lakewalk & Brighton Surveys
- 21-AA07 RFP for Baywalk Survey
- 20-99714 Snow Emergency Route Sign Installation
- 21-AA05 RFP for Engineering Svcs for Lakewalk & Shoreline Rehabilitation -Phase IV
- 21-AA09 RFP for Landscape Architect for Duluth Baywalk
- 21-AA08 RFP for Coastal Engineering for Baywalk-Seawall-Harbor Drive
- 21-0193 Pre-Insulated Pipe, Valves, Fittings & Accessories - Second St Phase 2
- 21-0152 Steam to Hot Water Building Conversions - Phase 3 Group B
- 21-99211 2021 Bituminous (Hot Mix) for Patching
- 21-AA12 RFP for Trauma Informed Care Consulting Services
- 21-99223 2021 Gas Blanket Project for Mains & Services - Citywide
- 21-03AA RFP for Special HUD Additional Allocation
- 20-99213 Bayfront Observation Deck Shoreline Repairs
- 21-99263 RFP for Engineering Svcs for Trail Relocation due to Brighton Beach Bank Failure
- 21-99290 City Hall Renovations to Ground, 3rd and 4th Floors
- 21-99268 Fairmount Snowmobile Trail
- 21-99269 Snowmobile Trail Bridges
- 21-4401 DAA Building 311 Mechanical Heating System Replacement
- 21-99234 Main Library Data Recabling
- 21-0238 Steam to HW Bldg Conversion - Ph 3 Group C
- 21-99261 2021 Citywide CIPP Lining
- 21-99314 Cross City Trail Relocation
- 21-AA10 RFP Engineering Svcs for Shoreline 7th to 21st Ave East and Brighton Beach
- 21-AA11 RFP Landscape Architect for Endion to 23rd Ave E and Brighton
- 21-AA14 RFP for Historic District Preservation Design Guidelines
- 21-99334 2021 Citywide Storm Sewer Upgrades
- 21-99343 Woodlawn Street Storm Sewer Extension
- 21-99344 Westwood Lane Sanitary Sewer Extension
- 21-0293 Steam to HW Bldg Conversions Ph 3 Grp D - Wells Fargo
- 21-0305 Steam to HW Bldg Conv Electrical Work Phase 3 Group C (Holiday Inn Complex)
- 21-AA16 RFP for Coastal Resilience Research and Assessment
- 21-AA15 RFP for Coastal Resilience Outreach Services
- 21-99387 Woodland Ave Gas Main Replacement Phase 3
- 21-99400 2021 Street Preservation
- 21-AA18 RFP for Parks and Recreation Master Plan
- RFP for a One Stop Operator - DWDB
- 21-4403 DAA Bldg 311 Parking Lot Improvements
- 21-AA19 Hartley Nature Center Building and Parking Additions
- 21-99282 Riverwest Drive Construction
- 21-99422 Park Point Storm Sewer Upgrades
- 21-99389 Hartley Park Sign Package
- 21-99456 Middle Booster Station Improvements
- 21-4402 DIA 2021 Taxiway A Reconstruction – Phase 1 (East)
- 21-AA21 Request for Qualifications for Tourism Marketing Services
- 21-AA20 RFP for Community Liaison - Construction Focus
- RFP - 2021 Youth Work Experience
- 21-99466 Duluth Downtown Fiber Optic Expansion
- 21-4404 2021 Hangar Area Pavement Rehabilitation
- 21-99519 City Center West Emergency Ops Center HVAC
- 21-0456 Steam to HW Bldg Conv Ph 3 Grp E - Bella Grace Bldg
- 21-99501 East Superior Street Reconditioning (45th - 60th Ave E)
- 21-99520 Gas Excess Flow Valve & Bollard Installation
- 21-99527 RFP Prof Engineering Svcs 21st Ave E Reconditioning Project
- 21-99547 Brighton Beach Trail Relocation
- 21-99565 Wheeler Sports Complex - Phase II Improvements
- 21-99495 HART Parking Ramp Repair and Maintenance
- 21-99578 DPD Impound Lot
- 21-99564 2021 Culvert Outfall Stabilization – 8200 & 8400 Congdon Boulevard
- 21-99581 2021 Citywide Guardrail Repair & Replacement
- 21-99575 Lakewalk Shoreline Rehabilitation - Phase IV
- 21-99620 Water Meters
- 21-AA24 RFP for City Hall MEP Renewal Design Services
- 21 AA24 RFP For City Hall MEP Renewal Design Svcs
- Pre Bid Meeting Sign In Sheet 21 AA24
- Addendum 1 To 21 AA24
- Addendum 1 Exhibit A Part 1 Of 2 Original Plans
- Addendum 1 Exhibit A Part 2 Of 2 Original Plans Early 1900S
- Addendum 1 Exhibit B Current Floor Plans As Phased For Construction In 2018 2021
- Addendum 2 To 21 AA24 9.2.21
- 21 AA24 Proposals Received
- 21-AA25 Demolition of 2101-5 West 3rd Street
- 21-AA28 RFI for Lot D Development
- 21-4405 DAA RFQ for Runway 3-21 Lighting Project Consultant
- 21-AA27 Service Station Fuels
- 21-99720 Stone Fill on Canal Park Shoreline
- 21-99774 RFP for The Marten Trail Shoreline Restoration Design
- Request for Quote 21-99791 Parking Lot Snow Removal
- 21-99750 Water Meters
- 21-AA31 Historic Window Replacement
- 22-AA03 Annual Water Treatment Chemicals
- 21-AA31 REBID Historic Window Replacement
- 22-AA04 Aggregates for 2022
- 22-99007 HDPE Pipe and Fittings
- 21-5501 Building Remodel
- 21-99797 Signage for Chester Park and other Park Entrances
- 21-AA31 THIRD Issuance for Historic Window Replacement
- 21-4406 Airport Janitorial Services
- RFP for Mixed Income Multi-Family Developments
- 2020 RFPs and Bids
- 20-01AA 2020 Water Treatment Chemicals
- 20-02AA Energy Assessments & Conservation Services
- 20-03AA Pre-Insulated Pipe, Valves, Fittings and Accessories
- 20-99072 RFP for Professional Design Svcs for Hartley Nature Center Building Addn - Ph 2
- 20-99073 RFP for Construction Mgr at Risk Svcs for Hartley Nature Center Bldg Addition - Ph 2
- 20-99165 Lift Station #15 Relocation
- 20-99199 RFP for Interpretive Plan for Waabizheshikana - The Marten Trail
- 20-99195 Fairmont Street Bridge Replacement
- 20-07AA RFP Wheeler Concessions and Softball League Director
- 20-99156 2020 Gas Blanket Project - Citywide
- 20-08AA Lake Superior Zoo Brown Bear Exhibit Renovation Phase 2
- 20-99186 RFP for Hartley Natural Area Plant Management
- 20-99169 Bituminous (Hot Mix) for Patching
- 20-05AA RFP for Community Development Software Solution
- 20-99265 DWP Trail Rock Fall Mitigation
- 20-99212 Woodland-Kent-East 8th St Traffic Signal Replacement
- 20-99236 HDPE Water Main Pipe for Second Street Reconstruction
- 20-99263 2020 Citywide CIPP Sanitary Sewer Lining
- 20-99150 Harrison Park Community Center Stair Removal (Rebid)
- 20-99287 Woodland Ave Gas Main Replacement - Ph 3 -POSTPONED UNTIL FURTHER NOTICE
- 20-4401 DIA Munitions Storage Area Utility System Repair
- 20-99294 Merritt Park Improvements
- 20-99273 2020 Citywide Utility Patch & Sidewalk
- 20-99304 Snow Emergency Route Sign Installations
- 20-99322 Second Street Reconstruction
- 20-99323 2020 Street Preservation Project
- 20-08AA REBID Zoo Brown Bear Phase 2 - Work Scope 3-B Shotcrete (Artificial Rockwork) ONLY
- 20-99339 Wheeler Athletic Complex Site Improvements
- 20-99344 Shoreline Rehabilitation near Water Treatment Plant
- 20-10AA Duluth Energy Systems HW Distribution System Balance of Plant
- 20-0282 Temp Traffic Signal W Superior St & Garfield Ave - Proj 1596
- 20-0379 CANCELLED - Fire Alarm Control Panel and Component Replacement
- 20-99364 DWP-to-Munger Connection Trail
- 20-99324 East Superior Street Reconditioning
- 20-4403 2020 Commercial Service Apron Expansion
- 20-4404 2020 Taxiway A Mill and Overlay
- 20-0353 Steam to Hot Water Building Conversions - Phase 3 Scope A
- 20-11AA DES Hot Water Distribution System Balance of Plant Electrical Construction
- 20-4402 RFQ Airport Consulting Services
- Re-released - Enger & Lester Golf Course Development
- 20-99363 Canal Park Lakewalk and Shoreline Restoration
- 20-13AA DES 2020 Manhole Repairs
- 20-0384 Chambers Grove Park Signage
- 20-0379 REBID FIRE ALARM CONTROL PANEL AND COMPONENT REPLACEMENT
- 20-99415 Waseca Bridges Repairs
- 20-99426 Outfall Repairs on Congdon Blvd
- 20-12AA RFP for Duluth Natural Resource Mgmt Program Plan
- 20-99433 Public Works & Utilities Building Roof Replacement
- 20-14AA RFP for Covid19 Special HUD Allocation
- 20-99379 Piedmont Rec Area Green Infrastructure Improvements
- 20-99380 Keene Creek Park Improvements
- 20-99435 Wheeler Maint Garage Civil & Concrete
- 20-99491 DWP Trail Signage
- 20-4405 Duluth Airport Authority Bldg 311 Roof Repair & Siding Replacement
- 20-99487 Duluth Traverse Trail Phase 9B
- 20-99479 Brighton Beach Trail Extension
- 20-99498 Construct Riley Road Salt Shed
- 20-99486 DWP Trail Capping and Improvements
- 20-99505 Oneota Street Bridge Demolition
- 20-15AA RFP for Environmental Worksheet Assessment (HDS-DOG)
- 20-99541 Cross City Trail Signage
- 20-09AA Reissue RFP for Case Management Software
- 20-99512 Fiber Optic Connection along Lake Avenue
- 20-6601 ISD709 Video Security Equipment
- 21-01AA 2021 Water Treatment Chemicals
- 20-6602 ISD709 Video Security Equipment Installation
- 20-4406 DAA Airport IT Services SOQ
- 21-AA02 RFQ West Duluth Tree Vaults
- 2019 RFPs and Bids
- 19-99694 Tree Replacements in Lincoln Park Area
- 19-99690 Site Preparation and Support for Large Stone Delivery
- 19-99660 Cross City Trail Phase 2 Construction
- 19-99643 Stone Materials for Canal Park Storm Damage Repair
- 19-99596 Seawall & Irvin Lighting
- 19-99581 Furnish & Install Lakewalk Fencing
- 19-99574 Gary New Duluth Recreation Area Improvements - Phase III
- 19-99562 Lower Michigan Street Gas Main Relocation
- 19-99528 2019-2020 Citywide Manhole Adjustments
- 19-99516 RFP Engineering Services for E 2nd Street Reconstruction
- 19-99446 RFP for Professional Services for Middle Booster Station
- 19-99422 RFP for Professional Services for East Superior Street Reconditioning
- 19-99398 Harbor Drive Overlay
- 19-99384 REBID 2019 Street Preservation
- 19-99375 Woodland Ave Gas Main Replacement Phase 2
- 19-99374 Shoreline Restoration - Phase II - 4th Ave E to 7th Ave E
- 19-99373 Lakewood Water Treatment Plant Filter Building Roof Replacement
- 19-99368 REBID Sargent Creek Bridge Restoration
- 19-99368 CANCELLED Sargent Creek Bridge RESTORATION
- 19-99349 RFP for Cross City Trail Temporary Relocation
- 19-99347 RFP for Engineering Services for October 2018 Storm Damage Repairs
- 19-99343 Soil Removal & Tree Planting - 5th Ave W (Request for Quotes)
- 19-99324 2019 Citywide Patch & Sidewalk
- 19-99285 City Center West HVAC Renovation
- 19-99282 2019 Citywide Gas Blanket Project
- 19-99247 WWI Veterans Memorial Construction
- 19-99241 Lift Station 9, 17 & 26 Improvements
- 19-99234 Riverwest Drive Gas Main Lowering
- 19-99165 2019 Bituminous (Hot Mix)
- 19-6601 ISD709 Security Improvements District Wide
- 19-5503 CHUM Vestibule
- 19-5502 Life House Commons Renovations
- 19-5501 Mechanical Systems Upgrade at CHUM Building
- 19-4405 DAA Airport Consulting Services RFQ
- 19-4404 2019 DAA Security Systems Update
- 19-4403 RFP Security Services for Duluth Airport Authority
- 19-4402 HVACBAS and Facilities Servies for Duluth Airport
- 19-4401 Sky Harbor Airport Runway Realignment - Phase III
- 19-28AA RFQ Consulting Services for Brownfield Assessment & Cleanup
- 19-27AA Pastoret Terrace Complex Demolition Project
- 19-26AA Request for Information - Enger Park & Lester Park Golf Courses
- 19-24AA RFP Eng Svcs DES Balance of Plant
- 19-23AA Motor Grader Lease
- 19-22AA DES Hot Water Plant Connection
- 19-21AA Hot Water Packaged Energy Transfer Stations for Phase 3
- 19-20AA Eng Svcs DES Bldg Conversions - Phase 3
- 19-19AA Zoo Brown Bear Exhibit Renovation Phase One
- 19-18AA Steam Converter System for Duluth Energy Systems
- 19-17AA RFP Professional Services for 2020 Street Preservation Project
- 19-16AA RFP Eng Svcs L8514 Bridge Replacement
- 19-15AA Golf Carts
- 19-14AA Lake Superior Zoo Black Bear Exhibit Renovation
- 19-13AA RFP for Grant Services - October 2018 Storm
- 19-12AA 2019 Lift Truck
- 19-09AA Construction Mgr At Risk for Lake Superior Zoo Polar Shores & Bear Country Project
- 19-08AA RFP for Final Design Services - Lake Superior Zoo Polar Shores & Bear Country Project
- 19-07AA RFP - Engineering Services for Trunk Highway 53 & Interstate 35 Utility Relocations
- 19-06AA REBID Coal for Steam Plant
- 19-06AA Coal for Duluth Energy Systems
- 19-06AA 2nd REBID - Coal for Steam Plant
- 19-0666 2019-20 Parking Ramp Rehabilitation
- 19-05AA RFP Develop and Implement an Energy Service Micro-Grid System
- Addendum 1 Complete 3.1.19
- Addendum 2 3.8.19
- Addendum 3 One Line Lakewood Pumphouse 1 Of 2
- Addendum 3 One Line Lakewood Pumphouse 2 Of 2
- Addendum 3 Treatment Plant 00616097 Record Drawings Final 11 2017
- Addendum 3 3.13.19
- Appendix C Electrical And Scada Data
- Planholder's List 19 05AA Microgrid
- Pre Bid Sign In Sheet
- Request For Proposal Package
- 19-0561 Salt Shed at 40th Toolhouse
- 19-0516 Park Entrance Signs
- 19-0509 Western Waterfront Trail Wayfinding and Amenities
- 19-0505 2019 Park Point Sanitary Sewer CIPP Lining (Phase 2)
- 19-04AA RFP for DPD Organizational Assessment
- 19-0476 Main Library Bathroom Remodel
- 19-0451 Decker Road Rehabilition and Utility Reconstruction (0843)
- 19-0367 Firehall 1 Slab Structural Repairs
- 19-02AA Duluth Streams Assessment
- 19-0216 MRO East Wall Repair - Phase II
- 19-01AA Annual Water Treatment Chemicals
- 2018 RFPs and Bids
- RFQ - Airport Consulting Services
- 18-5502 Window Replacements at CHUM Buildings
- 18-5501 Roof Replacement at Pine Grove Apartments
- 18-5501 REBID Roof Replacement at Pine Grove Apartments
- 18-4405 RFP Sky Harbor Airport Lot 8 Development
- 18-4404 BIDS OPEN 6-22-18 Runway 9-27 Reconstruction Phase 3
- 18-4403 Runway Realignment at Sky Harbor Airport
- 18-4402 RFP - Sky Harbor Airport Lot 8 Hangar Development
- 18-4401 RFP - Duluth Airport Vending Concession
- 18-16AA Duluth Seaway Port Authority Expansion Project
- 18-15AA RFP for City Banking Services
- 1 City Of Duluth Investment Policy
- 2 CC Processing For Airport
- 2 CC Processing For Building Safety Online
- 2 CC Processing For Building Safety
- 2 CC Processing For Comfort Systems Utility Operations
- 2 CC Processing For DECC 2
- 2 CC Processing For DECC Ticket Office
- 2 CC Processing For DECC
- 2 CC Processing For DTA
- 2 CC Processing For Parking Kiosks
- 2 CC Processing For Parking Tickets
- 2 CC Processing For SPMT 2
- 2 CC Processing For SPMT Moosehead Saloon
- 2 CC Processing For SPMT
- 3 Merchant Card Summary
- 4 Remittance Coupon Sample
- Addendum 1
- Addendum 2
- Attachment B Banking Analysis
- RFP For Banking Services 8.8.18
- 18-14AA RFP for EAW Preparation
- 18-13AA Snow Groomer
- 18-12AA Install Bldg HW Conversion Systems, Phase 1 Scope E
- Addendum 1
- Addendum 2
- Addendum 3
- Addendum 4
- Advertisement For Bids
- Bid Summary
- 18-19AA RFP Engineering Svcs for Lift Station No. 15 Relocation
- 18-11AA Install Bldg HW Conversion Systems, Phase 1 Scope D
- Addendum 1
- Advertisement For Bids
- 18-0112E RFP Eng Svcs W 10th and W 15th Road and Utility Easements
- 18-0142E Redundant Server Generator for IT Data Center
- 18-10AA Dead Ship Tow Appendix I - Vessel William A. Irvin Historical Drawings
- Aft Peak Bulkhead
- Aft Web Frames
- After Cabin Plan
- After Deckhouse Partitions
- After Deckhouse
- After Frames 173 186
- Afterframes 188 203
- Anchor Pocket
- Bulkhead No. 179 180
- Bulkhead No. 187
- Collision Bulkhead 16
- Forward Deckhouses
- Forward Web Frames
- Midship Section No. 3
- Mold Loft Offsets
- Profile And Decks
- Side Frames Aft Sheet 3
- Side Frames Aft
- Stern Anchor Pocket
- Sternpost
- Tank Top And Hopper Side
- 18-10AA Dead Ship Tow Appendix G - Krech Ojard Drawings - MN Slip Ped Bridge
- Ped Bridge P 1
- Ped Bridge P 10
- Ped Bridge P 11
- Ped Bridge P 12
- Ped Bridge P 13
- Ped Bridge P 14
- Ped Bridge P 15
- Ped Bridge P 16
- Ped Bridge P 17
- Ped Bridge P 18
- Ped Bridge P 19
- Ped Bridge P 2
- Ped Bridge P 20
- Ped Bridge P 21
- Ped Bridge P 22
- Ped Bridge P 23
- Ped Bridge P 24
- Ped Bridge P 25
- Ped Bridge P 26
- Ped Bridge P 27
- Ped Bridge P 28
- Ped Bridge P 29
- Ped Bridge P 3
- Ped Bridge P 30
- Ped Bridge P 31
- Ped Bridge P 32
- Ped Bridge P 33
- Ped Bridge P 34
- Ped Bridge P 35
- Ped Bridge P 36
- Ped Bridge P 37
- Ped Bridge P 38
- Ped Bridge P 39
- Ped Bridge P 4
- Ped Bridge P 40
- Ped Bridge P 41
- Ped Bridge P 42
- Ped Bridge P 43
- Ped Bridge P 44
- Ped Bridge P 45
- Ped Bridge P 46
- Ped Bridge P 47
- Ped Bridge P 48
- Ped Bridge P 49
- Ped Bridge P 5
- Ped Bridge P 6
- Ped Bridge P 7
- Ped Bridge P 8
- Ped Bridge P 9
- 18-10AA Dead Ship Tow - Temporary Relocation of the William A. Irvin
- 1 Irvin Relocation Final Specifcations 06.19.18 Rev. 4
- 2 Indemnity And Insurance Requirements FINAL
- 3 Bid Form 06.19.18
- Addendum 1 Draft Contract Rev 6 26 18
- Addendum 1 Final Tow Plans 07.10.18
- Addendum 1
- Appendix A USACE SS William Irvin 3178 Report 2017.03.01
- Appendix C North American Marine, Inc Report Museum SS William A. Irvin Marine Surveyor Assessment
- Appendix D Irvin Relocation Risk Register
- Appendix E USCG Tow Information WWM Dead Ship Movements
- Appendix F AMI Consulting Engineers DECC Seawall Consturction Drawings
- Appendix H USACE Reference Drawings MN Slip Bathymetry
- Appendix J Recommendations For Pending Tow
- Irvin Relocation Pre Bid Meeting Presentation 6.26.28
- Planholder's List
- Pre Bid Sign In Sheet
- RFP Temporary Relocation Of The William A. Irvin FINAL 6.20.18
- Specification Drawing Set 181078 Plan Set 06.19.18
- 18-09AA Install Bldg HW Conversion Systems, Phase 1 Scope C
- 18-07AA Phase 1 Scope B Bldg ETS Install
- 18-06AA RFP for Design and Graphic Arts Services
- 18-0635 Vehicle Barrier on Libarary-Depot Upper Lot
- 18-05AA Development RFP 3-story Multi-Family Bldg
- 18-0501 Replacement of Building Automation System
- 18-04AA Installation of Hot Water Energy Transfer Systems
- 18-0436 REPOSTED Lakewood Water Treatment Plant Roof Replacement
- 18-0436 Lakewood Water Treatment Plant Roof Replacement
- 18-0408 Riveness Regulator Station Building
- 18-0384 Structural Firefighting Turnout Gear
- 18-02AA RFP - McGonagle Development Site
- 18-02AA REBID RFP - McGonagle Development Site
- 18-0297 RFP - Waseca Industrial Blvd Extension
- 18-0287 2018 Citywide Utility Patch and Sidewalk
- 18-0279 2018 Citywide Sanitary Sewer CIPP Lining and Sewer Replacement
- 18-0267 2018 Chip Sealing
- 18-0266 2018 Street Preservation
- 18-0228 HDPE Water Main Fittings for Superior Street
- 18-01AA 2018 Grass Cutting - Various Locations
- 18-0182 Superior St Reconstruction Project
- 18-0180 2018 Gas Blanket Project - City Wide
- 18-0178E HDPE Water Main Pipe for Superior St - Phase 2 and 3
- 18-0173E Replace Morgan Park Community Center Roof
- 18-0169E Lakewalk Shoreline Repair - 4th Ave E to 7th Ave E
- 18-0161E Replace Firehall 6 Rooftop Air Handling Unit
- 18-0153 REBID Bucket Truck
- 18-0153 Bucket Truck
- 18-0133 Woodland Ave Gas Main Replacement
- 18-0131 2018 Gas Meter Relocation Project
- 18-0123E Salt Shed at Lund Toolhouse
- 18-0116E (REBID 18-10AA) Dead Ship Tow Appendix I - Vessel William A. Irvin Historical Drawings
- Aft Peak Bulkhead
- Aft Web Frames
- After Cabin Plan
- After Deckhouse Partitions
- After Deckhouse
- After Frames 173 186
- Afterframes 188 203
- Anchor Pocket
- Bulkhead No. 179 180
- Bulkhead No. 187
- Collision Bulkhead 16
- Forward Deckhouses
- Forward Web Frames
- Midship Section No. 3
- Mold Loft Offsets
- Profile And Decks
- Side Frames Aft Sheet 3
- Side Frames Aft
- Stern Anchor Pocket
- Sternpost
- Tank Top And Hopper Side
- 18-0116E (REBID 18-10AA) Dead Ship Tow Appendix G - Krech Ojard Drawings - MN Slip Ped Bridge
- Ped Bridge P 1
- Ped Bridge P 10
- Ped Bridge P 11
- Ped Bridge P 12
- Ped Bridge P 13
- Ped Bridge P 14
- Ped Bridge P 15
- Ped Bridge P 16
- Ped Bridge P 17
- Ped Bridge P 18
- Ped Bridge P 19
- Ped Bridge P 2
- Ped Bridge P 20
- Ped Bridge P 21
- Ped Bridge P 22
- Ped Bridge P 23
- Ped Bridge P 24
- Ped Bridge P 25
- Ped Bridge P 26
- Ped Bridge P 27
- Ped Bridge P 28
- Ped Bridge P 29
- Ped Bridge P 3
- Ped Bridge P 30
- Ped Bridge P 31
- Ped Bridge P 32
- Ped Bridge P 33
- Ped Bridge P 34
- Ped Bridge P 35
- Ped Bridge P 36
- Ped Bridge P 37
- Ped Bridge P 38
- Ped Bridge P 39
- Ped Bridge P 4
- Ped Bridge P 40
- Ped Bridge P 41
- Ped Bridge P 42
- Ped Bridge P 43
- Ped Bridge P 44
- Ped Bridge P 45
- Ped Bridge P 46
- Ped Bridge P 47
- Ped Bridge P 48
- Ped Bridge P 49
- Ped Bridge P 5
- Ped Bridge P 6
- Ped Bridge P 7
- Ped Bridge P 8
- Ped Bridge P 9
- 18-0116E (REBID 18-10AA) Dead Ship Tow - Temporary Relocation of William Irvin
- 1 REBID RFP With ATTACHMENTS 7.13.18
- 2 Irvin Relocation Final Specifcations 06.19.18 Rev. 4
- 3 Indemnity And Insurance Requirements FINAL
- 4 Bid Form 06.19.18 (Re Bid)
- 5 Draft Contract Rev 6 26 18
- Addendum 1 7.16.18
- Addendum 2 7.19.18
- AMI Presentation From Irvin Relocation Pre Bid Meeting (Rebid)
- Appendix A USACE SS William Irvin 3178 Report 2017.03.01
- Appendix C North American Marine, Inc Report Museum SS William A. Irvin Marine Surveyor Assessment
- Appendix D Irvin Relocation Risk Register
- Appendix E USCG Tow Information WWM Dead Ship Movements
- Appendix F AMI Consulting Engineers DECC Seawall Consturction Drawings
- Appendix H USACE Reference Drawings MN Slip Bathymetry
- Appendix J Recommendations For Pending Tow
- Prebid Sign In Sheet REBID 7.17.18
- Specification Drawing Set 181078 Plan Set 06.19.18
- 18-0095 Bituminous - Hot Mix Blacktop
- 18-0094E 2018 Citywide Catch Basin Improvements
- 18-0090E 9th and 8th Street Reconditioning
- 18-0084 Grand Ave Nordic Ctr Ski Trail Construction
- 18-0081E Riverside Park Improvements
- 18-0079 Irving Park Site Improvements Phase 1
- 18-0075E Chambers Grove Interpretive Trail Construction
- 18-0059E DWP Trail Rehabilitation
- 18-0058E Western Waterfront Trail Wayfinding and Amenities
- 18-0036 (REBID 17-0426) City Hall Renovations
- 18-0027 Steel Gate Valves for Gas System
- 18-0024 Pre-Insulated Pipe for Superior St - Phases 1 and 2
- 18-0019 HDPE Water Main Pipe for Superior Street - Phase 1
- 18-0008 2018 Water Treatment Chemicals
- 2017 RFPs and Bids
- 17-0594 Structural Steel and Sheet Piling for DECC Seawall REBID
- 17-0596 DECC Seawall Rehabilitation
- 17-0610 RFP Mechanical Design and Engineering Services for Building Conversions
- 17-0611 Temporary Steam to Hot Water Energy Transfer Stations
- 17-0612 Hot Water Packaged Energy Transfer Stations for Buildings
- 17-0612 REBID Hot Water Packaged Energy Transfer Stations for Buildings
- 17-4401 RFP for Duluth Intl Airport Janitorial Services
- 17-4402 Runway Realignment Project - Phase 1 Sky Harbor Airport
- 17-4403 2017 DIA Airfield Fence Improvements - Phase 2
- 17-4404 2017 DIA Runway 9-27 Obstruction Removal Project
- 17-4405 Roof Replacement - Snow Removal Equip Bldg and Hangar 103
- 17-5501 Roof Replacement - Dr Robert Powless Cultural Center
- 17-5502 Roof Replacement, Phase 2 - Dr Robert Powless Cultural Center
- 17-01AA All Hazard Response Vessel
- 17-03AA Service Station Fuels
- 17-0007 Water Treatment Chemicals for 2017
- 17-08AA RFP for Human Resources - Employee Benefits Consultant
- 17-09AA RFP for EAW Preparation
- 17-10AA - CANCELLED - Structural Steel and Steel Pilings - DECC Seawall Project
- 17-11AA - CANCELLED - Furnish and Install High Performance Coating on Steel Sheet Piles - DECC Seawall Project
- 17-11AA REBID Furnish and Install High Performance Coating on Steel Sheet Piles - DECC Seawall Project
- 17-0013 Oil, Lubricants and Supplies for Fleet Services 2017
- 17-13AA Trash and Recycling Services - City Locations
- 17-14AA Mailing Services for ComfortSystems
- 17-15AA Prof Engineering Services - Duluth Lakewalk and Shoreline Damage Assessment
- 17-0025 Aggregate Materials for 2017 (REBID)
- 17-0025 Delivered Aggregates for 2017
- 17-0026 Delivered Bulk Fuel 2017
- 17-0030 RFP for Public Awareness Information and Media Purchasing Services
- 17-0036 RFP Energy Assessments and Conservation Services
- 17-0039 Citywide Property Insurance
- 17-0083 Gas Blanket Project
- 17-0100 Parking Ramp Rehab at Three Locations
- 17-0108 Park Point Beach House North Wall Replacement
- 17-0132 Ventilation System at Fleet Garage
- 17-0157 2017 Bituminous (Hot Mix)
- 17-0159 Gas Meter Relocation Project - Citywide
- 17-0169 Water Street Shared Use Path
- 17-0176 2017 Fire Hydrants
- 17-0245 Michigan Street Utility Reconstruction - 1st Ave W to 3rd Ave W
- 17 0245 1601 ADDENDUM 1
- 17 0245 PLANS 1601 High Resolution
- 17 0245 PLANS 1601
- 17 0245 SPEC 1601
- 17 0245 Invitation To Bid
- Bid Tabulation
- Planholder's List
- 17-0611 REBID Temporary Steam to Hot Water Transfer Stations
- 17-0253 Whittier Street Reconstruction Project
- 17-0266 2017 Large Diameter Gas Main Installations
- 17-0273 Water Main Replacement - 89th Ave E. Creek
- 17-0275 Michigan St. Sanitary Sewer CIPP Lining, 2nd -5th Ave W
- 17-0276 2017 Citywide Sanitary Sewer CIPP Lining
- 17-0277 Anthracite Filter Media Replacement
- 17-0278 BWSR Sediment Reduction Drainage Improvements
- 17-0286 Amity Creek Bank Stabilization (Seven Bridges Road)
- 17-0301 Fire Hall No. 8 Interior Renovation
- 17-0340 (17-05AA) DWP Site Restoration - Earthwork
- 17-0341 (17-06AA) DWP Site Restoration - Invasive Species Removal, Seeding and Planting
- 17-0349 Irving Place Neighborhood Concrete Repair Project
- 17-0350 Magney-Snively Ely Peak Trail Maintenance
- 17-0364 MRO Facility Wall Repair
- 17-0382 Congdon Boulevard Reclamation
- 17-0383 4th Street Overlay Project
- 17-0387 West Skyline Parkway Retaining Wall Restoration
- 17-0402 - CANCELLED - 2017 Ford Interceptor Vehicles
- 17-0405 Fence Installation at Bayfront Festival Park
- 17-0406 Western Waterfront Trail Invasives Removal Seeding and Planting
- 17-0409 REBID West Duluth Deep Winter Greenhouse
- 17-0409 West Duluth Deep Winter Greenhouse
- 17-0424 Restroom Addition - Lafayette Community Ctr
- 17-0426 City Hall Interior Renovations
- 17-0433 Kenwood Ave Mill and Overlay and Lyons St Realignment
- 17-0437 Morgan Park Community Center Upgrades
- 17-0439 Miller Creek Bank Stabilization - Lincoln Park
- 17-0444 Pre-Insulated Hot Water Pipe Valves and Fittings - 20” ID (SERIES 2)
- 17-0445 Harrison Park Improvements - Phase 1
- 17-0466 DECC Pipe Repair
- 17-0472 Clyde Connector Trail Restoration
- 17-0474 Stewart Creek Bridge Restoration
- 17-0475 Michigan St Hot Water Pipe Installation
- 17-0498 Bridge L6116 Deck Rehabilitation (Aerial Lift Bridge)
- 17-0539 RFP - Prof Engineering Services for E 9th and E 8th St Reconditioning
- 17-0577 Western Waterfront Vegetation Restoration Phase 3
- 17-0593 Steam Turbine and Gear Reduction Set
- 2016 RFPs and Bids
- 16-0629 RFP Woodland-Calvary Rd Intersection Right-of-Way
- 16-0643 Minnesota Slip Pedestrian Bridge Rehabilitation
- 16-0657 RFP Duluth Traverse Trail System - Mini Master Plan
- 16-0658 RFP Duluth Lakewalk Trail Master Plan
- 16-0667 RFP for Indian Point Park Mini Master Plan
- 16-4401 DIA 2016 Airfield Fence Improvements
- 16-4402 DIA Runway 9-27 Reconstruction, Phase 2
- 16-5501 Life House Renovation
- 2016 Trail Projects Pre-Advertisement
- Biomass Preliminary Design RFP for Duluth Steam
- CANCELLED 16-0651 HART District Parking Ramp Structural Repairs
- 16-01AA Fire Rescue Vehicle
- 16-0002 Liquid Aluminum Sulfate
- 16 0002 Invitation For Bid
- 2016 Chemicals Bid Tab
- 2016 Water Treatment Chemical Bids Tabulation
- 16-02AA Western Waterfront Trail Restoration
- 16-05AA Gate, Wayfinding and Signage Plan for City Parks Department RFP
- 16-0006 Liquid Caustic Soda
- 16-08AA NetApp Storage Upgrade
- 16-10AA Western Waterfront Trail Restoration
- 16-12AA Lot D Soil Remediation
- 16-15AA RFP for a Public Safety Records Management System
- 16-18AA Trepanier Hall Elevator Upgrade
- 16-19AA Ski and Snowmobile Trails Blowdown Cleanup
- 16-0073 Rehabilitation and Relining Brewery Creek Storm Sewer Sections 29 and 31 - REBID
- 16-0076 Chester Creek Bank Stabilization
- 16-0080 Denfeld Edible Food Forest
- 16-0106 Fire Pumper
- 16-0115 Waterous Fire Hydrants
- 16-0132 2016 Contractor Gas Blanket Project
- 16-0136 Ductile Iron Water Main Pipe for SLC CSAH 9 Street Reconstruction Project
- 16-0137 (15-0463) Lowell to Lakewalk Trail - REBID
- 16-0153 2016 Manhole Adjustments and Bollard Installations
- 16-0173 (16-03AA) City Hall Interior Renovation - 4th Floor
- 16-0188 Relief Piping Modifications
- 16-0191 Hot Mix
- 16-0214 Hot Water System Design - Superior St RFP
- 16-0223 Superior Street Sanitary Sewer CIPP Lining
- 16-0228 Skyline Parkway Retaining Wall Repairs RFP
- 16-0239 Public Safety Building Parking Lot Repairs
- 16-0255 2016 Michigan St Utility Reconstruction from 3rd Ave W to 6th Ave W
- 16-0256 Congdon Boulevard Culvert Lining and Replacement
- 16-0263 Journeyman High Pressure Pipefitter
- 16-0264 (16-06AA) Foundation Work for Leif Erikson Viking Ship Enclosure
- 16-0266 Mount Royal Library Expansion
- 16-0274 Lakewood Water Treatment Plant HVAC System Improvements DUE DATE EXTENDED
- 16-0278 Duluth Traverse Trail Construction - Phase IV
- 16-0279 Duluth Traverse Trail Construction - Phase V
- 16-0289 Utility Cut-Off and Demolition of 5 Properties
- 16-0295 RFP Interpretive Signage for Hartley Park
- 16-0302 Construction of Chambers Grove Park Improvements
- Addendum 1
- Addendum 2
- Addendum 3
- Bid Tabulation
- Geotechnical Evaluation Report 3.9.16
- Part 1 IFB And Instructions Bid Form Contract Docs Etc.
- Part 2 Park Improvements Specifications 3.24.16
- Part 3 Park Improvements Plans 3.24.16
- Part 4 GLRI Stormwater Improvements UPDATED 3.30.16
- Planholder's List
- Pre Demolition Hazardous Waste Assessment 3.25.16
- 16-0307 Demolition and Install of Generators
- 16-0334 2016 Street Preservation Project - East Skyline Parkway
- 16-0338 Update Natural Gas Burner Control System for Duluth Energy Systems
- 16-0339 (16-07AA) Trail Repair and Improvements - Congdon, Chester, and Hartley Parks
- Addendum 1
- Addendum 2
- Addendum 3
- Addendum 4
- Addendum 5
- Bid Tabulation
- Part 1 Bid Information And Forms 4.12.16
- Part 2 Conditions Of Contract 4.12.16
- Part 3 Specifications 4.12.16
- Part 3A Congdon FEMA Plans 4.12.16
- Part 3B Chester FEMA Plans 4.12.16
- Part 3C Hartley Park Plans 4.12.16
- Part 3D Hartley Road Plans 4.12.16
- Planholder's List
- Prebid Sign In Sheet
- Wickcraft Boardwalk Information
- 16-0355 Furnish and Install Fencing for Bayfront Festival Park
- 16-0366 2016 Citywide Patch and Sidewalk
- 16-0372 Miller Creek Bank Stabilization - City Proj 1356
- 16-0373 18th Ave E Gas Main to UMD - Proj 1410
- 16-0397 Retaining Wall Replacement and Bridge L5930 Erosion Control Proj 1238
- 16-0405 Electrical Installation for Natural Gas Burner Upgrade
- 16-0413 2016 Citywide Driveway Culvert Replacement
- 16-0415 Western Waterfront Trail Renewal Project - 16-10AA REBID
- 16-0416 Gas Meter Relocation Project - Citywide Project 1430
- 16-0423 40th West Tool House Brine Shed (REBID)
- 16-0438 Arrowhead Kenwood Signal and Roadway Improvements Proj 1468
- 16-0475 Gas Main Installation for Cirrus Expansion
- 16-0497 Curbside Tree Debris Removal
- 16-0499 Energy Efficiency Lighting Project - to be Rebid
- 16-0499 Energy Efficiency Lighting Project REBID
- 16-0500 Tub Grinding and Transport of Storm Debris
- 16-0504 (16-14AA) Recreational Trails Blowdown Cleanup
- 16-0505 (1526) 16-Inch Natural Gas Re-Stop
- 16-0533 Addition to Building at Tree Farm - Riley Road
- 16-0548 Load and Haul Ground Debris to Hibbard Plant
- 16-0561 Maxwell Ave Watermain Extension
- 16-0587 Hartley Park Parking Lot Reconstruction
- 16-0595 Paint Traffic Control Signal Systems
- 16-0609 Utility Cutoff, Demo, and Site Restoration at 4 properties
- 16-0626 RFP for Spirit Mountain All Weather Mountain Bike Trail Design
- 16-0628 BIDS NOW DUE 11-7 MN Slip Bridge Parallel Shaft Reducers
- 2015 RFPs and Bids
- 15-0695 Arrowhead-Kenwood-W Cleveland Street and Signal Improvements RFP
- 15-0700 (1035) Congdon Blvd Reclaim RFP
- 15-0709 Firehall No. 1 Interior Remodel
- 15-0722 Superior St Reconstruction - Final Design
- 15-4401 DAA Sky Harbor Airport Vertical Pivot Gate and Fence Replacement
- 15-4402 Duluth International Airport - Runway 927 Reconstruction Phase I
- CANCELLED - TO BE REBID 15-05AF Timber Harvesting
- Notice of Sale - Street Sweepings
- RFP St. Louis River Corridor Public Recreation Projects
- RFQ Area Wide Plan for Western Port Neighborhoods
- 15-0001 Liquid Caustic Soda
- 15-01AA Fleet Information Management System Software RFP
- 15-01DS Aircraft Completion Center RFP
- 15-02AF Firehall Laundry Project
- 15-0003 Liquid Aluminum Sulfate
- 15-03AF Community Recreation Outside of School Time Youth Programs
- 15-04AA Golf Cart Lease
- 15-04AF Taxicab Inspections
- 15-05AA Soil Corrections - Cirrus Aircraft Completion Center
- 15-05AF Timber Harvest at Hartley Park
- 15-06AA Parks Buckthorn Removal RFP
- 15-07AF Garbage and Recycling
- 15-08AA Softball League Director RFP
- 15-09AA Recreation Management Software RFP
- 15-0107 Steam Line Replacement 10th Ave E - 3rd to 4th St
- 15 0107 Addendum 1
- 15 0107 Invitation To Bid
- Addendum 2
- Affidavit Of Non Collusion
- Certificate Of Exemption (Surety Deposits)
- Documents Required For Bidding
- EEO Form
- Instructions To Bidders
- Insurance And Indemnity Requirements Rev 2 16 11
- Payment Bond Rev 2 07 07
- Performance Bond Rev 8 10 09
- Plans For 10Th Ave E Steam Line
- Request For Bids
- Supplemental Gen Conditions 4 15 11
- 15-0121 (1391) 2015 Installation of High Pressure Gas Mains and Services
- 15-0122 (1408) Downtown Gas and Water Mains
- 15-0190 (1324) Congdon Blvd Slope Repairs
- 15-0202 (1303 and 1308) Retaining Walls Repair
- 15-0217 Utility Cut-Offs for 6 Demolished Buildings
- 15-0243 (1378) E 4th St Water Main Replacement
- 15-0256 (1411) Lift Station No 8 Reconstruction
- 15-0263 (1210) 8th Ave E Curb and Gutter REBID
- 15-0274 Grader Lease
- 15-0276 Hot Mix Fine REBID
- 15-0288 Utility Cut-off and Demo of four sites
- 15-0298 (1309) Gas and Water Main Replacements at 26th Ave W
- 15-0307 LED Street Lights
- 15-0315 (1417) Citywide Storm Sewer Improvements
- 15-0316 Pressure Reducing Valves
- 15-0318 (1287) Coffee Creek Box Culvert
- 15-0321 Park Point Beach House Stairs - REBID
- 15-0321 Park Point Beach House Stairs - TO BE REBID
- 15-0322 (1278) 2015 Debris Removal and Bank Stabilization West
- 15-0326 Steam Line Valve Replacements
- 15-0328 Mini Master Plan Lincoln and Memorial Parks RFP
- 15-0332 Lakewalk Stair Repair - Phase II
- 15-0333 Roof Replacements
- 15-0335 (1396) Citywide Sanitary and Storm Manhole Adjustments
- 15-0337 (0676TR) Cross City Trail Phase IV
- 15-0339 (1290) Amity Creek Bank Stabilization
- 15-0340 (1317) 2015 Trail and Culvert Flood Repairs
- 15-0363 (1394) 2015 Citywide Driveway Culvert Replacement
- 15-0365 Wade Stadium Improvements Phase II - Masonry Restoration
- 15-0367 City Center West Restroom Renovation
- 15-0369 Fire Hall No. 2 Windows
- 1 IFB And Instr Firehall 2 Windows
- 10 Supp Gen Conditions 4 15 11
- 2 Draft Construction Contract
- 3 Affidavit Of Non Collusion
- 4 EEO Form
- 5 Responsible Contractor
- 6 Firehall 2 Final Window Plans 5 27 15
- 7 Firehall 2 Final Spec 5 27 15
- 8 Special Conditions
- 9 General Conditions 4 14 11
- Addendum 1
- Addendum 2
- Addendum 3
- BID FORM 6.10.15
- Bid Summary
- 15-0370 Interior Remodel Fire Station No. 4
- 15-0377 (1435) Eastridge Estates Drainage Improvements
- 15-0378 (1336) 2015 Street Preservation - 46th Ave W, 40th Ave E and Pecan Ave
- 15-0380 (1382) 2015 Street Preservation - Skyline Pkwy and Glenwood St
- 15-0385 (1044) 2015 Street Preservation - Woodland Ave
- 15-0405 (1416) Knowlton Creek Water Main Relocations
- 15-0412 DFD Pumper Truck - REBID
- 15-0412 Fire Department 1500 GPM Pumper
- 15-0413 (1428) 2015 Sidewalk and Hand Railing
- 15-0413 (1428) 2015 Sidewalk and Hand Railing - rebid
- 15-0415 (1452) Shared Use Path Lakewalk to 29th Ave E
- 15-0419 Mini Master Plans for Various City Parks
- 15-0425 Gary New Duluth Community Center and Rec Area Improvements - REBID
- 15-0425 Gary New Duluth Community Center and Recreation Area Improvements
- 15-0449 Duluth Traverse Trail Construction
- 15-0460 Mini Master Plan Quarry Park
- 15-0463 (1327) Lowell to Lakewalk Trail
- 15-0466 (1465) Hawthorne Rd Storm Sewer Improvements and Street Repairs
- 15-0469 Central Hillside Park Improvements
- 15-0480 (1333) Tischer Creek Water Main Replacement at Fairmont St
- 15-0481 (1472) Twelve-Inch Gas Main Replacement at Knowlton Creek and Grand Ave
- 15-0498 Skywalk Door Replacement
- 15-0499 Interior Remodel Fire Station No. 6
- 15-0500 Fire Hall No. 1 Generator Project
- 15-0505 (15-02AA) CMAR for Aircraft Completion Center
- 15-0515 (1477) Woodland Ave Storm Sewer CIPP Lining
- 15-0517 (1440) Grading and Removal of Bridge No. 6201
- 15-0527 (0036ST) Rehab-Reline of Brewery Creek Storm Sewer Sections 29 and 31
- 15-0530 (1486) Airport Rd Sanitary Sewer Relocation
- 15-0558 (1491) Ridgeview Road Infrastructure
- 15-0559 (1055) Ridgeview Road Reconditioning and Reconstruction
- 15-0579 Prof Design Services - Chambers Grove Park
- 1 Request For Proposals Dated 9.3.15
- Addendum 1
- Appendix A Standard Agreement
- Appendix B Grant Application Chambers Grove
- Appendix C Grant Agreement Chambers Grove
- Appendix D Phase II DOE For Chambers Quarry And LSM Railroad
- Appendix E Archaeological Recon Chambers Grove
- Appendix F Boundary And Topographic Survey 7 30 14
- 15-0641 (1493) City Wide Street Lighting Upgrades
- 15-0642 Street Lighting
- 15-0658 (1487) 59th Ave W Utility Improvement Project
- 15-0663 and 15-0665 Demo of Properties
- 15-0664 Cirrus Site Soils Corrections - Not Awarded
- 15-0674 Fire Station No. 6 Driveway Replacement
- 2014 RFPs and Bids
- 14-4404 DAA - Digital Development RFQ
- 14-4501 Contract A Reversible Water Supply and Runoff Collection Pipeline
- 14-4502 Contract B Water Supply Pump Stations
- 14-4503 Contract C Hillside Water Improvements
- 14-4504 Contract D Water Pumping Improvements; Pump Station Packages
- DAA-Air Traffic Control Tower HVAC and Roof Replacement
- Maurices Headquarters and City of Duluth Parking Ramp
- BID DUE DATE EXTENDED TO 06 02 14
- CP 2 Bid Solicitation Documents Maurices Headquarters 5.19.14
- I - CP2 Substructure for Proposal
- II - CP2 Substructure for Proposal
- Maurices Headquarters and City of Duluth Parking Ramp Project - Continuation
- Maurices Headquarters-Parking Ramp Bid 1
- Maurices Roofing Bid Solicitation
- RFP for Ethnographic Study of American Indian Heritage of Duluth
- RFQ - Brownfield Assessment
- RFQ - Public Art Strategic Plan
- RFQ for Grant Writing Services
- Spirit Mt Grooming Tractor
- 14-02DS RFP Turnkey Automated Revenue and Access Control Parking System
- 14-03DS (1323) Traverse Trail - Misison Creek Phase II
- 14-03DS (1323) Traverse Trail Phase II REBID
- 14-04DS RFP Computerized Maintenance Management System (CMMS) for Property and Fac Mgmt Div
- 14-04DS RFQ for Spirit Mountain Recreation Area Public Arts Commission
- 14-0007-Hydrofluorosilicic Acid
- 14-0008-Aluminum Sulfate
- 14-08DS RFP for Stream Engineering Design and Construction
- 14-0009-Caustic Soda
- 14-09DS RFP -Unified Threat Management - Next Generation Firewall
- 14-10DS RFP For Lowell to Lakewalk Trail Phase I (1327)
- 14-17DS RFP - ECM Suite
- 14-19DS Wade Stadium Artificial Turf
- 14-20DS (14-2-TR) Comfort Systems Interior Remodeling
- 14-21DS Spirit Mountain - Prefabricated Vehicle Bridge
- 14-22DS Operation, Mtce, and Dev of Enger Park Golf Course and (Optimal) Operation of Lester Park Golf Course
- 2011Maintequipcapitallease
- 2012 2014Contractreimbursements
- 2013Cartoperatinglease
- Duluth Golf RFP ERB Final Edit 7 10 14 (4)
- Enger Clubhouse Proposed Design DSGW 16 Feb 2014
- Enger Park Business Plan Draft 10 2013
- Golf Prebid Meeting Questions 07292014
- NGF Duluth Report
- Pgmmanagementagreement
- Question Re Equipment Lease
- Survey Analysis
- 14-23DS Wade Stadium Improvements - Phase I Field and Lighting
- 14-24DS - RFP Lester Park Golf Course Dev
- 14-27DS West Duluth Sports Corridor RFP
- 14-0028 (0514WA) West Duluth Reservoir Roof Reconstruction
- 14-28DS Jay Street
- 14-31DS Chester Ski Jump Memorial RFQ
- 14-32DS Kayak Bay Small Area Development Plan
- 14-0083 Gravel, Washed Sand, Rock, Rip-Rap
- 14-0128 (0840GS) 3rd St Gas Main Replacement
- 14-0129 (1315) 2014 Installations of High Pressure Gas Mains and Services at Various Locations
- 14-0130 (1314) 2013 Gas Riser Replacements
- 14-0133 (1113) 7 Bridges Rd Realignment and Slope Repairs
- 14-0137 (1072) CIPP Rehab of Sanitary Sewers
- 14-0142 (0084SN) Lift Station No. 23 Reconstruction
- 14-0149 (1089) Hidden Valley Water Main Replacement Phase 1
- 14-0174 (1299) Great Lakes Regulator Station Building
- 14-0237 (1233) 2012 Flood Repairs - Bridge 69K19 on Toledo St
- 14-0240 (1244) 2012 Flood Repairs - West Bridges
- 14-0244 Asphalt Hot Mix
- 14-0245 Gravel, Washed Sand, Three-Fourths-Inch Washed Rock, Rip-Rap-Bedding Sand
- 14-0279 (1313) 2014 Citywide Patch and Sidewalk Cancelled
- 14-0281 (0753TR) 10th Ave E Reconstruction
- 14-0304 (1304) Bridge 92277 A-G, I and K
- 14-0306 (1078) Kingsbury Creek Utility Relocations
- 14-0306 (1078) Kingsbury Creek Water Main Relocation (Rebid)
- 14-0306 (1078) Kingsbury Creek Water Main Relocations (Rebid-2)
- 14-0315 (1207) Huntington St Sidewalk, Box Culvert and Slope Repairs
- 14-0330 (1313) 2014 Lake Ave, Citywide Concrete Patch and Sidewalk
- 14-0331 (1358) 2014 Bituminous Patch
- 14-0359 (1177) 2012 Flood Repairs - Retaining Walls and Bridge L 6115
- 14-0362 (1331) 43rd Ave W San Sewer Ext
- 14-0367 (1235) Bridge 92277 H and J
- 14-0390 (0846TR) 2014 Street Preservation
- 14-0402 (1210) 8th Ave E Drainage Improvements
- 14-0403 (1274) Creek Bank Debris Removal and Bank Stabilization
- 14-0408 (1178) Retaining Walls at Bridge 88552
- 14-0421 (1242) 2014 City Wide Storm Sewer Improvements
- 14-0428 (1371) E Skyline Pkwy Storm Sewer Improvements
- 14-0436 (1359) Riverside - Gogebic Creek Storm Sewer and Slope Repairs
- 14-0459 City Hall 1st Fl Renovation Phase 1
- 14-0462 (14-21-RH) Upper Lot Bituminous Replacement Fire Station No. 1
- 14-0465 LED Roadway Luminaires
- 14-0476 (1176) 2012 Flood Repairs - Rehab of Bridge L6113
- 14-0482 (1334) 2014 Street Preservation - 2nd Ave W and 21st Ave W
- 14-0487 (1316) Congdon Park Trails Reconstruction
- 14-0500 City and SLC Stair Reconstruction
- 14-0502 City Hall Generator Replacement
- 14-0511 (1238) Repair of Bridge L6129 on Woodland Ave at Tischer Creek
- 14-0544 (1383) Lift Station No. 39 Flow Meter Improvements
- 14-0560 (1372) Lakeview Ave Sanitary Sewer Extension
- 14-0561 (1346) Avondale Street Stormwater Drainage Improvements
- 14-0562 (1175) Rehab of Bridge 91143 on 3rd St at Chester Creek
- 14-0563 (1073) 85th Ave W Water Main Extension
- 14-0565 (1209) 1st Ave E Storm Sewers
- 14-0611 Library Parking Ramp Vehicle Barriers
- 14-0612 40Th Ave Toolhouse Upgrades
- 14-0621 (0711ST) Macfarlane Rd Box Culvert
- 14-0671 and 0672 Demolitions
- 14-4401 DAA - Sky Harbor Airport Apron Installation - Ph 2
- 14-4402 DAA Professional Security Services RFP
- 14-4403 DAA - Professional Airport Consulting Services RFQ
- 14-11DS (14-06-TR) Exterior Renovation of Fire Station No 1
- 14-11DS Invitation to Bid
- 14-11DS Specs
- ADDENDUMS
- ADDEND NO 1
- ADDEND NO 2
- ADDEND NO 3
- ADDEND NO 4
- 2013 RFPs and Bids
- 13-0466 (1197) E 3rd St and Bent Creek Down Drain Repair
- 13-0468 (0568TR) Cross City Trail Phase I (Re-Bid)
- 13-0470 (0923TR) RFP Superior St Reconstruction Planning and Prelim Design
- 13-0475 Lund Tool House Roof Replacement
- 13-0537 Cold Mix-Taconite Tailings
- 13-0538 (REBID) LED Parking Ramp Fixtures
- 13-0543 LED Lighting on Lakewalk
- 13-0582 Copper Service Water Line Fittings
- 13-0592 (1127) Bristol St Box Culvert
- 13-0593 (1126) 63rd Ave W Box Culvert
- 13-0619 (1220) Guardrail Installation and Repair
- 13-001 RFP Design and Construction of Duluth Corporate Office Tower, Parking Ramp, and Skywalk Project
- 13-0006 Golf Carts and Turf Utility Carts
- 13-08DS (0753TR) RFP - 10th Ave E Phase 1
- 13-09DS (1223) Traverse Trail Phase 1 - Lester Park REBID
- 13-10DS (1224)Traverse Trail Phase 1 - Mission Creek REBID
- 13-11DS Duluth Steam Vault Repair - 4th Ave W and 1st Street
- 13-0012 Liquid Chlorine
- 13 0012 Liquid Chlorine
- Water Treat Chem Bid Tab
- CLOSED-2013 Spirit Mtn Prefabricated Vehicle Bridge
- CLOSED-CANC-13-0531 LED Parking Ramp Fixtures
- CLOSED-CANC-13-0538 LED Parking Ramp Fixtures
- CLOSED-CM RFQ-Construction Mgr at Risk-Request for Qualifications
- CLOSED-DAA- Janitorial
- CLOSED-DEDA RFQ for Consultant Services for Website
- CLOSED-RFP Intersection Control Evaluation Planning Study for Duluth Area
- CLOSED-RFP Medicare Supplement Plan
- CLOSED-Spirit Mt Groomer
- 13-12DS Demolition - Westminster Presbyterian Church
- 13-0013 Hydrofluorosilicic Acid
- 13-13DS (0923TR) RFP-Topographic and Utility Survey for Superior St
- 13-0014 Aluminum Sulfate
- 13-0015 Caustic Soda
- 13-15DS RFP Turnkey Automated Revenue and Access Parking System
- 13-0016 Clarifloc N330P or Equiv Polymer
- 13-16DS Systems Backup Software
- 13-0017 Liquid Anhydrous Ammonia
- 13-20DS RFP East Streams
- 13-21DS RFP West Streams
- 13-22DS Radisson Library Skywalk Tunnel
- 13-23DS Window Replacement Parking Ramp
- 13-24DS Door Replacement Parking Ramp
- 13-25DS Fire Station 10 Slab Replacement
- 13-26DS City Center West Roof Replacement
- 13-0027 RFP Public Awareness Media Services
- 13-27DS Steam Main Installation - 1st Alley and 7th Ave W
- Bid Tabulation
- Addend No 1
- Invitation to Bid
- Plans and Specs
- 13 26DS Invitation To Bid
- Drawing M1 9 11 13
- Drawings S1 & S2 9 11 13
- E General Conditions
- F Special Conditions
- G Supplementary Conditions
- H Wage Rates Highway Heavy
- I EEO Affirmative Action
- J Affidavit Of Non Collusion
- K IC 134 Withholding Affidavit
- M Contract Form
- N Indemnification & Insurance Requirements
- O Performance Bond
- P Payment Bond
- Q Contractor Hall Route
- R Gopher State One Call Requirements
- S Div 15 Technical Specs
- 13-28DS Demolition City Purchased Properties
- 13-29DS Demolition Memorial Community Center
- 13-30DS (1271) Misson and Kingsbury Creeks Debris Removal and Stabilization
- 13-33DS Demo Fond Du Lac Comm Ctr
- 13-35DS-RPF Workers Compensation Administrator
- 13-0070 Aerial Bucket Truc
- 13-0073 (0858SN) Lift Station 14 Reconstruction
- 13-0096 Lift Bridge Signal Gates
- 13-0121 (0839GS) 8 Inch Gas Main Replacement
- 13-0143 (0687TR) Lakewalk East Extension Phase IV
- 13-0144 (1155-1156) Mill and Overlay of 27th Ave W and Vinland St
- 13-0189 (1199) West Duluth Reservoir Surge Tank
- 13-0190 (1211) 2013 Water System Improvements
- 13-0191 (1228) Penton Blvd Storm Sewer Extension
- 13-0192 (1167) Lift Station No 39 Improvements
- 13-0232 LED Luminaires
- 13-0240 Concrete for Repairs
- 13-0241 Crack Sealer
- 13-0245 (1061) Plum St Overlay
- 13-0245 (1061) Plum Street Overlay
- 13-0248 (1032) 2013 Street Preservation
- 13-0249 (1187) Cascade Park Permanent Flood Repairs
- 13-0250 (1208) High Pressure Gas Mains and Services at Various City Locations
- 13-0253 (1203) Olney Street Reconstruction
- 13-0258 (1240) 2013 Citywide Sidewalk
- 13-0262 Hot Mix Fine Asphalt
- 13-0290 (1225) 2013 Gas Service Riser Replacements and Improvements
- 13-0304 Trees for Planting
- 13-0324 (1150) Lakeside Court Easement San Sewer Extension
- 13-0331 (1243) 20th Ave E Sanitary Sewer Replacement
- 13-0335 (1172) 2012 Flood Repairs Hawthorne, Vermilion and St Marie
- 13-0336 (1253) Enger Golf Course Repairs Phase I
- 13-0341 (1183) 2012 Flood Repairs Hillside
- 13-0360 (1250) 2012 Flood Repairs - 45th Ave E
- 13-0368 (1151) Lawn St Sanitary Sewer Extension
- 13-0371 Coal
- 13-0373 (1173) - 2012 Flood Repairs - Lakeside
- 13-0389 6 Inch Steam Piping
- 13-0401 (1202) Merritt Creek Flood Repairs
- 13-0426 (0568TR) Cross City Trail Phase I
- 13-0429 (1259) Irving Park Bike Trail Repair
- 13-0437 (1226) 2012 Flood Repairs - Bridge 88547 and Armory Bsmt
- 13-0437 (1226) Rehab of Bridge 88437 Duluth Armory (RE-BID)
- 13-0437 (1226) Rehab of Bridge 88547 at Duluth Armory (REBID)
- 13-0440 (1145) 2012 Flood Repairs - Triggs Ave
- 13-0443 (1260) 108th Ave W Culvert Replacement
- 13-0446 Annual Appliance Parts
- 13-0449 (1236) 2012 Flood Repairs 7 Bridges Rd
- 13-0458 (1170) Chester Park Ski Trail Bridge 2
- 13-0462 (1198) 43rd Ave E Creek Outlet Repairs
- 13-0463 (1264) 4th St and Old Howard Mill Rd Down Drain Repair
- 13-0464 (1132) 4th Alley and Brewery Creek Storm Tunnel Repairs
- 13-4401-DIA-New Parking Structure and Exterior Wayfinding Signage
- 13-4401 ADDEND
- 13-4401 BID INFO
- 13-4401 BID TABS
- 13-4401 PLANS
- 13-4401 SPECS
- 13-001DS Enger Park Shelter Improvements and Rotary Peace Plaza
- 13-001DS ADDEND NO 1
- 13-001DS ADDEND NO 2
- 13-01DS Invitation to Bid
- Planholders List
- Documents
- Bid Set - E-Files 031813
- 00 10 Special Conditions
- 00 1 Spec Cover
- 00 2 CERTIFICATION
- 00 3 Table Of Contents
- 00 4 Arch Invitation To Bid
- 00 5 Instructions To Bidders
- 00 6 Bid Proposal Form
- 00 6A Performance Bond
- 00 6B Payment Bond
- 00 6C Affidavitt Of Non Collusion
- 00 6D Equal Opportunity EEO Statement
- 00 6E IC 134 Witholding Affidavit
- 00 6F Proj Labor Agreement
- 00 7 General Conditions
- 00 8 Supplemental General Conditions
- 00 9 Prevailing Wage Rates 031413
- 01 1000 Summary
- 01 2000 Price And Payment Procedures
- 01 3000 Administrative Procedures
- 01 4000 Quality Requirements
- 01 5000 Temporary Facilities And Controls
- 01 6000 Product Requirements
- 01 7300 EXECUTION
- 01 7419 Construction Waste Management
- 01 7700 CLOSEOUT PROCEDURES
- 02 4119 SELECTIVE DEMOLITION
- 03 3000 Cast In Place Concrete
- 04 2000 Unit Masonry
- 06 1000 Rough Carpentry
- 07 2500 Weather Barriers
- 07 4646 Fiber Cement Siding
- 07 9200 JOINT SEALANTS
- 08 7100 FL DOOR HARDWARE
- 09 2900 GYPSUM BOARD
- 09 9100 Painting
- 10 1400 Signage
- 10 2113.19 Plastic Toilet Compartments
- 10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES
- 12 3661 SIMULATED STONE COUNTERTOPS
- Bid Set - PDFs 031813
- Westbrook Patio Homes
- Bid Set - E-Files 031813
- 13-019DS CHCC Exterior Window and Door Replacement
- Addendum
- Invitation to Bid
- Plans
- Specs
- 2012 RFPs and Bids
- 12-0521 Annual Cold Mix
- 12-0533 (1142) Gogebic St and Lanigan Blvd
- 12-0534 Flat Plow Blades
- 12-0535 Grader Blades
- 12-0540 (1016) Rehabilitation of Bridge L6007
- 12-0542 (1166) 7th Ave E Flood Damage Reconstruction
- 12-0544 (1117) Vermillion Rd Flood Repairs
- 12-0592 Cold Mix Taconite Tailing
- 12-0603 (1185) 59th Ave W Storm Tunnel Repair
- 12-0616 (1170) Chester Pk Ski Trail Bridge
- 12-0617 (1171-1194) Chester Pk Phase 1 Bridge
- 12-0628 (1128) Greene St Box Culvert
- 12-2012 VD - Sidewalk Kiosk RFP
- 12-4401 DAA - New Passenger Terminal Bid Pkg 2C Sitework and Apron, Concessions and Furnishings
- 4 Revised BP 2C Invitation To Bid BP 2C
- Addendum No 1
- Addendum No 2
- Addendum No 3
- Plans Volumes
- Volume 1
- Volume 2
- Spec Volumes
- Volume 1
- Volume 2
- Volume 3
- Volume 4
- 12-4403 DAA - Wayfinding Signage and Hazardous Material Abatement
- RFP Flex Spending Acct Admin, COBRA Admin, Retiree Billing Commuter (FSA)
- 12-01DS-Fuels Station and Bulk
- 12-01SM Bid Package 1 - Spirit Mountain Chalet
- 12-0002 Liquid Anhydrous Ammomia
- 12-02DS Anderson Rd (0357TR)
- 12-02SM Spirit Mt Chalet Bid Package 2
- 12-0003 Liquid Chlorine
- 12-03DS Acoustical Ceiling
- 12-0004 Hydrofluorosilic Acid
- 12-04DS Duluth Steam Chimney Stack Rehabilitation
- 12-0005 Liquid Aluminum Sulfate
- 12-05DS Enger Tower Gazebo Project
- 12 05DS Enger Tower Gazebo Bid Tabulation
- Planholders List From Sheldon Repro
- 12-05DS ADDEND NO 1
- 12-05DS ADDEND NO 2
- 12-05DS Bid Packages
- 12-0006 Caustic Soda
- 12-06DS Miscellaneous Painting-Plastering Work
- 12-0007 Clarifloc Polymer
- 12-07DS RFQ-Consultant Services to Prepare Economic Dev Strategy Plan for City of Duluth
- 12-08DS (1051) RFP - Traffic Study - Arrowhead and Kenwood
- 12-09DS Duluth City Hall MIS Upgrade Proj No. 11-047
- 12-10DS (0439TR) Oxford-Livingston-Glenwood Reconstruction
- 12-0012 Uniforms
- 12-13DS (0657TR) Safe Routes to School Sidewalk Improvements
- 12-14DS (1138) Cody Street Slope Repair Project
- 12-15DS (0645TR) Lakewalk East Extension Phase V
- 12-20DS Enger Park Electrical Upgrade
- 12 20DS Enger Electrical Upgrade All In One
- Bid Summary
- 12-20DS ADDEND No 1
- 12-20DS ADDEND No 2
- 12-21DS RFP - City of Duluth Softball League Director
- 12-23DS Park Point Communications Tower
- 12-26DS Occupational Medical Services
- 12-0034 Gate Valves
- 12-0036 Portable Toilets
- 12-0037 Tree and Stump Removal
- 12-0038 Citywide Grass Cutting
- 12-0043 Transition Cast Couplings (simplified bid)
- 12-0044 Water and Gas Valve Box Parts (simplied bid)
- 12-0080 Fire Hydrants
- 12-0097 Mainline Water Valves
- 12-0136 (1001SN) Sliplining of 2 HDPE San Sewer in Columbia St
- 12-0140 Water Main Repair Clamps
- 12-0164 (0922TR) 2012 Concrete Pavement Rehabilitation
- 12-0207 (1075) 2012 High Pressure Gas Mains and Services at Various Locations
- 12-0241 Aerial Fire Apparatus
- 12-0248 Concrete for Repairs
- 12-0249 Crack Seal
- 12-0309 Hot Mix Fine
- 12-0334 (0959ST) Atlas Industrial Park Improvements
- 12-0337 (1066) Lakewood Water Treatment Plant Lagoon Solids Removal and Disposal
- 12-0340 (0983SN) CIPP Rehabilitation of Sanitary Sewers in Basin 24
- 12-0364 2012 Citywide Sidewalk Assessment Project (0938TR)
- 12-0370 Demolition Bid
- 12-0433 Scott SCBA Integrated Firefighter Self-Rescue Device
- 12-0436 (1083) Reconstruction of 17th Ave E
- 12-0451 (1135) Hutchinson Road Repairs
- 12-0451-1 (1135) Hutchinson Rd Repairs Rebid
- 12-0458 (1136) W 10th St Repairs
- 12-0486 (1111) Westgate Blvd Flood Damaged Utilities and Street Repairs
- 12-0514 Thermal Imaging Cameras
- 2011 RFPs and Bids
- 11-4404 DAA - RFP for Parking Lot Mgmt and Operation
- DEDA Bayfront Transient Boat Facility
- DEDA RFP 2010-01 Bayfront District RFP Supp Ph II Contamination Inv, Geotech Ev, and Prep of Response Action Plan
- Plan Map
- RFP Doc
- SAP Slip2and3 Cover Figures 2007
- Engineering Docs
- Report Flysheets PHU
- 01_Report
- 02_Figures
- 03_Appendix A-Phase I Documentation
- 04 Appendix B
- 05_Appendix C_Historical Documentation
- 06_Appendix D_Regulatory Records
- 08_Appendix F
- 09_Appendix G_Qualifications
- 07_Appendix E_Previous Investigations on DVD
- DEDA RFP 2010-02 Bayfront District RFP Technical Assistance
- Plan Map
- RFP Document
- Engineering Documents
- Report Flysheets PHU
- 01_Report
- 02_Figures
- 03_Appendix A-Phase I Documentation
- 04 Appendix B
- 05_Appendix C_Historical Documentation
- 06_Appendix D_Regulatory Records
- 08_Appendix F
- 09_Appendix G_Qualifications
- 07_Appendix E_Previous Investigations on DVD
- Ref. 1f_Hist Summ Rpt_Bayfront, 500-1000 RR St_Barr 2008
- Ap92ac 1
- Appendix C Hist Aerials With Notes
- Appendix D Hist Plats(Annotated)
- Appendix E Hist Topos(Annotated)
- Appendix F Historical Maps
- Appendix G Other Hist Pics Or Figs
- APPEND~1
- APPEND~2
- APPEND~3
- Bayfront Hist Sum Rpt 0308
- Figure 1 Property Location
- Figure 2 Parcel Information
- Transmittal Letter 052008
- Figure 3
- Ref. 1g_Ph I Duluth Waterfront Properties_Barr 2004
- 01 Ph I Rpt & App A Duluth Waterfrnt
- 02 Waterfront Figure 1
- 03 Waterfront Figure 2 Final
- 06 APP~1
- 07 App E Site Visit Photos
- 08 App F Limitations And Qualifications
- 04_App B Historical Info
- 05_App C_Regulatory Reports
- Ref. 1i_Limited Ph1_Barr 1992
- Ref. 5b_Ph II Investigation Duluth Waterfront_Barr 2004_0804
- Ref. 5c_J and D Tank Removal Report 1990
- Ref. 5d_Former Food Service of America_AET 1994
- Ref. 1f_Hist Summ Rpt_Bayfront, 500-1000 RR St_Barr 2008
- Duluth Airport Authority - General Liability Insurance
- Group Benefit Plans
- RFP Group Life, ATP Short Term Disability, Long Term Disability and Family Medical Leave
- RFP Workforce Dev - Dislocated Worker Programs
- RFQ-Spirit Mt Recreational Area II Projects
- Spirit Mountain Alpine Coaster Parking Lot
- Spirit Mountain Chalet Entrance
- Spirit Mountain Detachable Lift Purchase
- Spirit Mountain Zip Line Purchase
- Spirit Mt Concession Bldg Bid
- Sprit Mountain Lease Purchase Bank Rates
- 11-02DS Enger Tower Lighting - Bid Package No. 2
- 11-04DS High Density Storage New Police Headquarters
- 11-05DS REBID Fleet Floor Resurfacing
- 11-06DS RFQ-RFP Distribution Integrity Management Plan
- 11-07DS-Solar Powered Trash-Recycling Kiosks
- 11-08DS-Utility Billing Mailing Services
- 11-0009 Hydrofluorosilicic Acid
- 11-09DS RFP Gas Asset Mgmt
- 11-0010 Liquid Anhydrous Ammonia
- 11-10DS Steam Pipe for Steam Plant Expansion
- 11-11DS Steamline Extension - 2nd Street and 10th Avenue East
- 11-0012 Aluminum Sulfate
- 11-0013 Liquid Chlorine
- 11-13DS-1 Enger Tower Gazebo
- Bid Result Form
- Engineer Contact And Planholder's List
- ADDEND NO 1
- ADDEND NO 2
- ADDEND NO 3 (Including Rev Request for Bid)
- ADDEND NO 4
- ADDEND NO 5
- ADDEND NO 6
- BID COMPLETE PROJ MANUAL
- COMBINED SET
- 11-0014 Caustic Soda
- 11-14DS (OT-9438B) Selected Skywalk Bridge Re-Coating
- 11-0016 Clarifloc N-300P or Equivalent Polymer
- 11-16DS City Hall Elevator Modernization REBID
- 11-0019 Elevator Maintenance
- 11-19DS Outfit 4 Each International Plow Trucks
- 11-20DS- A REVISED RFP Time and Attendance System
- 11-20DS RFP for Time and Attendance System
- 11-21DS CISCO Local System Network Infrastructure
- 11-22DS Duluth Steam Vault Repair (2nd Ave E and Superior St)
- 11-24DS Higher Education Area Market Study
- 11-25DS-Police Headquarters Furniture
- 11-26DS RFP Parking Lot Management Services
- 11 26DS Fund 505 Operating Expenses 2008 2010 And 2010 Revenues 2
- 11 26DS RFP Parking Lot Management 11 30 11
- Parking Lot Management RFP Attachment A
- Parking Lot Management RFP Attachment B
- Performance Bond Rev 8 10 09
- 11-26DS ADDENDUMS
- 11-26DS ADDEND NO 1
- 11-26DS ADDEND NO 3
- 11-26DS ADDEND NO 4
- 11-26DS ADDEND NO 5
- 11-26DS ADDEND NO 6
- 11-27DS RFP - Operation of Indian Point Campground
- 11-29DS Police Headquarters Lab Equipment
- 11-30DS Siding Replacement for Firehall 2
- 11-32DS Garbage-Refuse Removal and Recycling Pickup
- 11-33DS - RFP Oxford-Livingston-Glenwood Reconstruction
- 11-34DS - RFP for Special Assessments Application
- 11-35DS - RFP for Home Energy Application System
- 11-36DS City of Duluth Woodland Firehall Reroof
- 11-37DS 2011 Library Ramp Renovation
- 11-38DS RFQ NorShor Theater Partnership
- 11-40DS Police Headquarters Cisco Network System
- 11-41DS RFP Sign Code
- 11-42DS Data Equipment Racks
- 11-43DS NetApp Storage Equipment
- 11-44DS RFP for Fax Server
- 11-0045 Gravel-Washed Sand-Rock-Rip-Rap
- 11-45DS RFP Park Point Beach House
- 11-0046 Concrete
- 11-0087 A Relocation of Steel Gas Main
- 11-0107 Mobile Radio Upgrades - Digital
- 11-0228 Flusher Tank Truck Retrofit
- 11-0257 (0356TR) 36th Ave E Reconstruction
- 11-0274 NorShor Theatre Reroofing of the Orpheum Building
- 11-0290 (0904GS) High Pressure Gas Mains and Services
- 11-0292 (0496TR) Rehabilitation of Bridge No. 69812
- 11-0299 Lenovo Laptops
- 11-0302 Miracle Fields at Harrison Community Center
- 11-0313 (0851TR) Ivanhoe Street Reconstruction
- 11-0320 (0036ST) Brewery Creek Storm Sewer RFP
- 11-0331 (0622TR) Construction of Bridge No. 69679
- 11-0332 (0828TR) 2011 Street Preservation Project
- 11-0344 (0068TR) Rehab of 2nd St Bridge at Chester Creek
- 11-0345 (0982SN) 2011 CIPP Rehabilitation of Sanitary Sewers
- 11-0362 (0603SN-0604ST) 2011 Manhole Adjustment
- 11-0373 Main Public Library Mechanical System and Building Envelope Udates
- 11-0398 Parking Lot Lighting Upgrade
- 11-0426-(0910TR) Remove Signal Systems 12th and 14th Avenues East
- 11-0437 (1020) 2011 Citywide Street Maintenance Project
- 11-0445 (0893SN) CIPP Rehabilitation of Sanitary Sewers in Basin No. 2
- 11-0446 (0892SN) Lift Station 45 Pumping and Forcemain Improvements
- 11-0512 (0699SN) Riverside Community Utility and Street Improvements
- 11-0519 Demolition at Various City Sites
- 11-0528 RFQ and Proposal ComfortSystems Natural Gas Cost of Service and Rate Study
- 11-0533 (0936TR) CDBG-ARRA Sidewalk Replacement
- 11-0562 Truck Plow Blade Edges
- 11-4401A DIA REBID 14.21A Elevators and Escalators
- 11-4402 DAA New Passenger Terminal VALE
- 11-4403 DAA - New PassengerTerminal 2B Interior Finishes
- 11 4403 DAA Invitation To Bid
- BP 2B New Passenger Terminal Bidtabs Final Numbers 09202011
- 11-4403 ADDEND No 1
- 11-4403 ADDEND No 2
- 11-4403 Plans and Specs
- 11-03DS RFP - GPS-AVL Tracking Systems with Commercial Wireless Service
- ADDEND NO 1
- ADDEND No 2
- ADDEND NO 3
- RFP Docs
- 11-39DS RFP FINAL 3 Copier-Printer Mgmt Svcs
- 11-39DS ADDEND NO 2
- 11-39DS RFP FINAL 3 AND REV ADDEND NO 1
- 11-4401 DIA - New Passenger Terminal
- 11-4401 Invitation to Bid
- ADDEND NO 1
- ADDEND NO 2
- ADDEND NO 3
- ADDEND NO 4
- ADDEND NO 5
- ADDEND NO 6
- 60% CIVIL SITE BINDER
- ADDEND 6 FRONT
- ARCHITECTURAL PERMIT DWGS AND SPECS
- BP 1 NEW PASSENGER TERMINAL CONFORMANCE SET
- BP-2A ADDENDUM NO. 6 - BAGGAGE HANDLING SYSTEMS
- 30% Documents
- 12.31.09 30% Plans
- 5528 E001
- 5528 E002
- 5528 E110
- 5528 E114
- 5528 E200
- 5528 E300
- 5528 E301
- 5528 E400
- 5528 F001
- 5528 F110
- 5528 F111
- 5528 F112
- 5528 F113
- 5528 F114
- 5528 F115
- 5528 F401
- 5528 F501
- 5528 M001
- 5528 M002
- 5528 M110
- 5528 M111
- 5528 M112
- 5528 M113
- 5528 M114
- 5528 M115
- 5528 M116
- 5528 M117
- 5528 M201
- 5528 M301
- 5528 M302
- 5528 M401
- 5528 M402
- 5528 M501
- 5528 M502
- 5528 M503
- 5528 P001
- 5528 P100
- 5528 P101
- 5528 P102
- 5528 P103
- 5528 P110
- 5528 P111
- 5528 P112
- 5528 P113
- 5528 P114
- 5528 P115
- 5528 P116
- 5528 P117
- 5528 P118
- 5528 P119
- 5528 P120
- 5528 P121
- 5528 P301
- 5528 P401
- 5528 P402
- 5528 P501
- A001 Abbreviations And General Notes
- A101 Overall First Floor Plan
- A102 Overall Second Floor Plan
- A103 Overall Third Floor Plan
- A104 Overall Roof Plan
- A110 First Floor Area A
- A111 First Floor Area B
- A112 Second Floor Area A
- A113 Second Floor Area B
- A114 Third Floor Area A
- A115 Third Floor Area B
- A201 Overall First Floor RCP
- A202 Overall Second Floor RCP
- A203 Overall Third Floor RCP
- A301 Exterior Elevations
- A302 Exterior Elevations
- A310 Building Sections
- A311 Building Sections
- A401 Wall Sections
- A402 Wall Sections
- A520 Section Details
- A530 Exterior System Sheet Vertical Circulation
- A531 Interior System Sheet Vertical Circulation
- A532 Interior System Sheet Vertical Circulation
- A533 Interior System Sheet Vertical Circulation
- A540 Vertical Circulation Details
- A601 Interior Elevations
- A602 Interior Elevations
- A710 Exterior System Sheet Landside Curtain Wall
- A711 Exterior System Sheet Landside Curtain Wall
- A712 Exterior System Sheet Airside Curtain Wall
- A713 Exterior System Sheet Airside Curtain Wall
- A714 Exterior System Sheet Entry Vestibule
- A715 Exterior System Sheet Core Wall
- A716 Exterior System Sheet Tug Tunnel
- A717 Exterior System Sheet Tug Tunnel
- A718 Exterior System Sheet Tug Tunnel
- A719 Exterior System Sheet Canopy
- AS100 Overall Site Plan
- AS101 Architectural Site Plan
- MBJ STRUCT 01 05 10
- G100 Cover Sheet
- G101 Drawing List
- 12.31.09 30% Specifications
- 00000 DD Outline TOC
- 01010 Summary Of Work
- 01027 Application For Paymentl
- 01035 Modification Procedures
- 01040 Coordination
- 01050 Field Engineering
- 01200 Project Meetings
- 01210 Allowances
- 01230 Alternates
- 01270 Unit Prices
- 01300 Submittals
- 01400 Quality Requirements
- 01421 Standards & Definitions
- 01450 Structural Tests And Special Inspections
- 01500 Const Facilities & Temporary Controls
- 01631 Products & Substitutions
- 01700 Contract Closeout
- 01732 Selective Demolition
- 01740 Warranties
- 02221 Building Demolition
- 03100 Concrete Formwork
- 03200 Concrete Reinforcement
- 03300 Cast In Place Concrete
- 05120 Structural Steel
- 05121 Architecturally Exposed Structural Steel
- 05312 Steel Roof Deck
- 05360 Composite Steel Deck
- 05400 Cold Formed Metal Framing
- 05500 Metal Fabrications
- 05510 Metal Stairs
- 05530 Metal Gratings
- 05720 Ornamental Handrails Railings
- 06100 Rough Carpentry
- 06220 Interior Prefinished Wall Surfacing
- 06402 Interior Architectural Woodwork
- 07210 Thermal Insulation
- 07413 Insulated Core Metal Wall Panels
- 07543 Thernoplastic Polyolefin (TPO) Roofing
- 07610 Sheet Metal Roofing
- 08110 Steel Doors And Frames
- 09402 Resinous Matrix Terrazzo Flooring
- 09514 Acoustical Metal Pan Ceilings
- 10155 Toilet Compartments
- 14240 Hydraulic Elevators
- 14310 Escalators
- 14950 Passenger Boarding Bridges
- 15000 Mechanical
- 15300 Fire Protection
- 15400 Plumbing
- 16000 Electrical
- 12.31.09 30% Plans
- 60% Documents
- 02.15.09 60% Plans
- 02.15.09 60% Specs
- 90% Documents
- BP-2A ADDENDUM NO. 2
- Addendum 2 Drawings PDF
- 1 DLH C004 Addendum 2
- 10 A721%20Exterior%20System%20Sheet%20 %20Tug%20Tunnel
- 11 A722%20Exterior%20System%20Sheet%20 %20Tug%20Tunnel
- 12 5528 M001
- 13 5528 M002
- 14 5528 M110
- 15 5528 M111
- 16 5528 M112
- 17 5528 M113
- 18 5528 M114
- 19 5528 M115
- 2 S118
- 20 5528 M116
- 21 5528 M202
- 22 5528 M301
- 23 5528 M303
- 24 5528 M303A
- 25 5528 M401
- 26 5528 M402
- 27 5528 M403
- 28 5528 M502
- 29 5528 M503
- 3 S506
- 30 5528 M506
- 31 5528 MP110
- 32 5528 MP111
- 33 5528 MP112
- 34 5528 MP113
- 35 5528 MP114
- 36 5528 MP115
- 37 5528 E001
- 38 5528 E110
- 39 5528 E111
- 4 A101%20Overall%20First%20Floor%20Plan
- 40 5528 E112
- 41 5528 E113
- 42 5528 E114
- 43 5528 E115
- 44 5528 E118
- 45 5528 E200
- 46 5528 E201
- 47 5528 E300
- 48 5528 E401
- 49 5528 E403
- 5 A110%20First%20Floor%20Area%20A
- 50 5528 E404
- 51 5528 E405
- 52 5528 E406
- 53 5528 E407
- 54 5528 E408
- 55 5528 EL111
- 56 57 58 59 60 61 62 63 Tech%20BP2A ADD1 022411
- 6 A111%20First%20Floor%20Area%20B
- 64 5528 P101
- 65 5528 P110
- 66 5528 P111
- 67 5528 P112
- 68 5528 P113
- 69 5528 P114
- 7 A606%20Interior%20Elevations
- 70 5528 P115
- 71 5528 P301
- 72 5528 P302
- 73 5528 P303
- 74 5528 P501
- 75 5528 F111
- 76 5528 F112
- 77 5528 F113
- 78 5528 F501
- 8 A701%20Door%20Schedules%20A701%20Door%20Schedules%20(1)
- 9 A720%20Exterior%20System%20Sheet%20 %20Tug%20Tunnel
- Addendum 2 Spec
- Addendum 2 PDF
- Addendum 2 Drawings PDF
- Northland Constructors of Duluth LLC
- Item 1
- Item 3
- Item 4
- Meeting Minutes No. 11 New Passenger Terminal
- Meeting Minutes No. 5 New Passenger Terminal
- Meeting Minutes No. 9 New Passenger Terminal
- Minutes No. 1 New Passenger Terminal
- Minutes No. 10 New Passenger Terminal
- Minutes No. 12 New Passenger Terminal
- Minutes No. 13 New Passenger Terminal
- Minutes No. 14 New Passenger Terminal
- Minutes No. 2 New Passenger Terminal
- Minutes No. 3 New Passenger Terminal
- Minutes No. 4 New Passenger Terminal
- Minutes No. 6 New Passenger Terminal
- Minutes No. 7 New Passenger Terminal
- Minutes No. 8 New Passenger Terminal
- Item 5
- Item 6
- 08162010 3 Week Look Ahead Schedule #1
- 08232010 3 Week Look Ahead Schedule #1
- 08302010 3 Week Look Ahead Schedule #1
- 08302010 3 Week Looh Ahead
- 09062010 3 Week Look Ahead Schedule #1
- 09082010 Draft 4 Schedule
- 09132010 3 Week Look Ahead Schedule #1
- 09202010 3 Week Look Ahead Schedule #1
- 09272010 3 Week Look Ahead Schedule #1
- 10042010 3 Week Look Ahead Schedule #1
- 10112010 3 Week Look Ahead Schedule 10 14 10
- 10182010 3 Week Look Ahead Schedule 10 21 10
- 10252010 3 Week Look Ahead Schedule10 28 10
- 11012010 3 Week Look Ahead Schedule
- 11082010 3 Week Look Ahead Schedule
- 11152010 3 Week Look Ahead Schedule
- Northland Constructors' Notice To Proceed
- Item 7
- KACC October 1 2010 Letter To NC
- KACC October 13 2010 Letter To DAA
- KACC October 14 2010 Letter To NC
- KACC October 20 2010 Letter To NC
- KACC October 4 2010 Letter To NC
- KACC October 7 2010 Letter To RS&H
- NC October 1 2010 Letter To KACC
- NC October 19 2010 Letter To KACC
- NC October 20 2010 Letter To KACC
- NC October 4 2010 Letter To KACC
- NC September 30 2010 Letter To KACC
- RS&H October 8 2010 Letter To KACC
- DOCUMENTS
- 2010 RFPs and Bids
- 10-0004 Hydrofluorosilicic Acid
- 10-0005 Aluminum Sulfate
- 10-0006-Caustic Soda
- 10-0044 Mailing Services
- 10-0083 RFP Wayfinding Skyline Blvd
- 10-0154 Phase II Repairs of City Hall Steam Tunnel (Proj 0926B)
- 10 0154 ADDEN NO 1
- 10 0154 ADDEND NO 2
- 10 0154 Invitation To Bid
- 10 0154 Request For Bids Form
- Duluth Steamtunnel II Bid Tab
- STEAM TUNEL II CONTACT LIST
- 10 0154 ADDEN NO 1 (1)
- 10 0154 ADDEND NO 2 (1)
- 10 0154 Invitation To Bid (1)
- 10 0154 Request For Bids Form (1)
- Duluth Steamtunnel II Bid Tab (1)
- STEAM TUNEL II CONTACT LIST (1)
- 10-0166 Concrete for Repairs
- 10-0169 Aerial Bucket Truck
- 10-0198 Dump Bodies and Hydraulics
- 10-01DS Auto Body Repair - Cars and Light Trucks
- 10-0201 (0587TR) 2010 Tree Planting
- 10-0202 (0884GS) High Pressure Gas Mains and Services at Various City Locations
- 10-0214 Community Center Cleaning
- 10-0224 (0647TR) Glenwood Street Reconstruction
- 10-0228 Park Point Fire Station 5
- 10-0229 City Hall Window Replacement - Ph I
- 10-0272 (0519SN) East Interceptor Sanitary Sewer Overflow Storage Facility, Phase 2
- 10-0278 (0900GS) Painting Gas Meter Piping
- 10-0293 (0838GS) 8 Inch Gas Main Replacement
- 10-0297 (0903SN) CIPP Rehab of Sanitary Sewers for Lift Station 16 Sewershed
- 10-0299 (0891SN) East Interceptor Sanitary Sewer Overflow Storage Facility, Phase 3
- 10-0314 (0768WA) Highland 1,000,000-Gal. Elevated Water Storage Tank
- 10-0318 (0765WA) Highland Pump Station Improvements
- 10-0326 (10-18DS) Miracle Fields at Harrison Comm Ctr
- 10-0342 (10-20DS) PWU Garfield Storage Garage
- 10-0344 (10-19DS) RFP for Preliminary Engineering for Joshua Ave Duluth Heights Connector
- 10-0356 (0540TR) Rehab of Bridges 92277A Through 92277K
- 10-0357 (0820TR) 2010 Street Preservation Project
- 10-0361 (0822TR) Concrete Pavement Rehabilitation
- 10-0368 (0601SN-0602ST) 2010 Sanitary and Storm Manhole Adjustment Program
- 10-0386 Demolition at Various City Sites
- 10-03DS-Project 0868TR Sheet Pile Retaining Wall Rehab
- 10-0422 Coal 2010-2011, 2011-2012 and 2012-2013
- 10-0425 (0817TR) CDBG-ARRA Sidewalk Replacement Phase 2
- 10-0437 Maintenance Shop Slab Rehabilitation
- 10-0445 (0895ST) Cody Street Box Culvert
- 10-0456 (0857SN) 2010 Lift Station Improvements
- 10-0496 (0699SN-TR) RFP for Riverside Utility and Street Improvements
- 10-04DS RFP Land Management Solutions
- 10-05DS RFP Design and Rehabilitate Five Lift Stations
- 10-06DS RFP Port Security Surveillance System
- 10-07DS Motor Grader Lease
- 10-085 City of Duluth Housing Inspection-Fire Prevention Relocation
- 10-08DS Quarterly Newsletter
- 10-09DS RFP - Parking Lot Management
- 10-10DS Comprehensive Energy Audit
- 10-11DS One Ton 4x4 Truck with Service Body, Crane, Plow
- 10-12DS 16-Ft Construction Van
- 10-13DS (0569TR) Lakewalk Phase III
- 10-14DS Lockbox Banking Services
- 10-16DS Simplified Bid for Gas Meter Relocating
- 10-17DS Utility Van Body-Canopy
- 10-21DS RFP for Anderson Road
- 10-22DS RFP Mun State Aid Proj for 36th Ave East
- 10-23DS RFP Ivanhoe Street Improvement Project
- 10-24DS RFP Port Security Camera System
- 10 24DS ADDEND NO 1
- 10 24DS ADDEND NO 2
- 10 24DS ADDEND NO 3
- 10 24DS ADDEND NO 4
- 10 24DS RFP Response Form 8 20 2010
- Duluth Port Security RFP 10 24 DS
- RFP Summary For Web
- Technology Drawings 8 09 10
- 10 24DS ADDEND NO 1 (1)
- 10 24DS ADDEND NO 2 (1)
- 10 24DS ADDEND NO 3 (1)
- 10 24DS ADDEND NO 4 (1)
- 10 24DS RFP Response Form 8 20 2010 (1)
- Duluth Port Security RFP 10 24 DS (1)
- RFP Summary For Web (1)
- Technology Drawings 8 09 10 (1)
- 10-25DS Collection Agency Services
- 10-28DS City Hall Elevator Modernization
- 10 28DS ADDEND NO 1 City Hall Elevator Modernization
- 10 28DS ADDEND NO 2 City Hall Elevator Modernizaton
- 10 28DS City Hall Elevator Modernization 100728
- 10 28DS ELEVATOR COVER LETTER 100728
- 10 28DS ADDEND NO 1 City Hall Elevator Modernization (1)
- 10 28DS ADDEND NO 2 City Hall Elevator Modernizaton (1)
- 10 28DS City Hall Elevator Modernization 100728 (1)
- 10 28DS ELEVATOR COVER LETTER 100728 (1)
- 10-29DS Fleet Epoxy Coating and Repairs
- 10-30DS Tuckpointing Various City Buildings
- 10-31DS City of Duluth Police Headquarters
- 10-32DS (OT-806 REBID) Fire Hall 1,4,7 Improvements - Bituminous Paving
- 10 32DS 1 (OT 806 RE BID) Invitation To Bid
- 10 32DS 1 Bid Results
- 10 32DS 1 Planholder's List
- 100823 PAVING SPECIFICATIONS Fire Stations 1 4 7
- FIRE HALL 1,4, AND 7 PAVING DRAWING
- 10 32DS 1 (OT 806 RE BID) Invitation To Bid (1)
- 10 32DS 1 Bid Results (1)
- 10 32DS 1 Planholder's List (1)
- 100823 PAVING SPECIFICATIONS Fire Stations 1 4 7 (1)
- FIRE HALL 1,4, AND 7 PAVING DRAWING (1)
- 10-32DS Environmental Consultants
- 10-33DS (10-0448) West Steam Vault Repair - 1st Ave E and Superior Street
- 10-34DS (10-0491) Enger Tower Restoration - Bid Package No. 1
- 10-36DS RFP Workers Comp
- 10-37DS RFQ - Historic Building Design Services
- 10 37DS ADDEND NO 1
- 10 37DS RFQ Historic Building Design Form And Cover
- Norshor Pics
- Norshor Pics (1)
- Norshor Theater 004
- Norshor Theater 005
- Norshor Theater Basement 001
- Norshor Theater First Floor 002
- Norshor Theater Upper Floor 003
- Norshore Floor Plans
- 10 37DS ADDEND NO 1 (1)
- 10 37DS RFQ Historic Building Design Form And Cover (1)
- Norshor Pics (2)
- Norshor Pics (3)
- Norshor Theater 004 (1)
- Norshor Theater 005 (1)
- Norshor Theater Basement 001 (1)
- Norshor Theater First Floor 002 (1)
- Norshor Theater Upper Floor 003 (1)
- Norshore Floor Plans (1)
- 10-38DS RFQ (RFP) Prof Engineering Svcs for Lift Station and Forcemain Replacement
- 10-4401-DAA-New Passenger Terminal
- DAA New Passenger Terminal Volume 1 Specification Binder1
- DAA New Passenger Terminal Volume 2 Specs Binder1
- New Passenger Terminal BP 1 Bid Tabs
- 10 4401 Bid Tab
- 10 4401 Invitation To Bid
- DAA New Passenger Terminal Volume 1 Civil Bid Doc Full Size Plan Set
- DAA New Passenger Terminal Volume 1 Specification Binder1 (1)
- DAA New Passenger Terminal Volume 2 Specs Binder1 (1)
- New Passenger Terminal BP 1 Bid Tabs (1)
- 10-4401 ADDEND No. 1
- 10-4401 ADDEND No. 2
- 10-4402 DAA RFP Heating, Ventilation, and Air Conditioning and Facility Services
- 2009 RFPs and Bids
- 09-0001 Pump House Heating - Lakewood
- 09-0006 Liquid Anhydrous Ammonia
- 09-0007 Liquid Chlorine
- 09-0008 Hydrofluorosilicic Acid
- 09-0009 Liquid Aluminum
- 09-0010 SuperFloc N-300 Floculant
- 09-0031 Bituminous Material - Black Top
- 09-0127 Gas Relief Valves
- 09-0141 Asphalt Paver
- 09-0159 Golf Carts and Golf Cart Utility
- 09-0217 Concrete for Utility Excavation Repairs
- 09-0220 1 Ton 4x4 Extended Cab and Chassis
- 09-0223 Valve Box Parts
- 09-0224 PE HP Gas Parts
- 09-0225 Fire Hydrants
- 09-0237 2008 Capital Improvement Projects (Roof Repair)
- 09-0241 Duct Cleaning in City Hall
- 09-0245 REBID Duluth City Hall Roof Replacement
- 09-0248 Arlington Maintenance Bldg
- 09-0272 Demo and Installation of Coal Elevator
- 09-0273 Reconstruction of Woodland Ave
- 09-0276 Gas Svcs at Various Locations
- 09-0283 2009 Chevrolet Tahoe
- 09-0289 Project 0696SN (Lakeside Interceptor SSO)
- 09-0295 REBID Self-Propelled Articulating Boom (Genie Model Z-45-25J-RT)
- 09-02DS Utility Financial Consultant and Sales Broker
- 09-0320 REBID Project No. 0792TR - Aerial Lift Bridge Painting and General Structural Rehab Work
- 09-0331 (0218TR) Lakeside Lower Central SIP
- 09-0343 (0724SN) 2009 CIPP Rehab of Sanitary Sewers
- 09-0350 (0414GS) Painting Gas Meter Piping
- 09-0354 (0410SN) 2009 Sanitary and Storm Manhole Adjustment
- 09-0370 Washed Sand
- 09-0371 (0383TR) Reconditioning of 2nd Street
- 09-03DS 1 Ton 4x4 Extended Cab and Chassis
- 09-0414 Furnace Appliance Parts
- 09-0456 Boiler Ash Tipping Fees
- 09-0457 Hauling Boiler Ash
- 09-0458 Project 0695WA (Arlington Pump Station)
- 09-0476 2009 Water Main Replacement (0738WA)
- 09-0481 US Courthouse Chilled Water Extension
- 09-0493 RFP-RFQ Public Awareness and Media Purchasing Services
- 09-0494 Grader Cutting Edges
- 09-0495 Truck Plow Cutting Edges
- 09-04CP 4-Door Sedan
- 09-0501 Sidewalk Replacement and Pedestrian Ramps (0816TR)
- 09-0508 (0631ST) Amity Creek Tributary Stream Stabilization
- 09-0509 (0703ST) Skyline Parkway Storm Sewer Repair
- 09-0518 Police Digita Dictation System
- 09-0524 Outfit Single Axle Truck
- 09-0528 (0802SN) Lift Station No 6
- 09-0558-Demolition at Various City Sites
- 09-0559 Triple Combination Pumper Fire Engine
- 09-0564-1st Street Coney Island Parking Ramp Upgrades
- 09-0580-RFP CMMS Software
- 09-05DS Self Propelled Articulating Boom
- 09-06CP-One-Ton Cargo Van
- 09-07CP 4-Door Sedan
- 09-08DS 1 Ton 4x4 Reg Cab and Chassis
- 09-09CP-Prof Svcs to Update Greenhouse Gas Emissions Inventory
- 09-10DS City Project 0047GS (2009 Comprehensive Supervisory Control and Data Acquisition System)
- 09-11DS (0774TR) CDBG Downtown Area Phase 6 Accessibility Project - Curb Ramps and Sidewalk Replacement
- 09-12DS Parks and Recreation Master Plan
- 09-13DS RFP for Employee Benefits Counsulting Services
- 09-14DS Solar Kiosks
- 09-15DS City Council Chambers Remodel
- 09-16DS Audio-Video-Data Equipment Installation
- 09-17DS Firehall 10 Furniture, Fixtures, Appliances
- 09-18DS (1) Vehicle Storage at Tree Farm Site
- 09-18DS Munger Trail Extension (0568TR) RFQ
- 09-18DS Vehicle Storage at Morningside Pit
- 09-19DS RFP Glenwood Street - Municipal State Aid Proj
- 09-20DS Duluth Zoo - Polar Shores Modifications
- 09-21DS RFP Design Svcs for Police Headquarters Bldg
- 09-22DS Lake Superior Zoo Tiger Deck
- 09-23DS 2009 Mill and Overlay
- 09-24DS Maintenance Operations Fencing and Other City Sites
- 09-25DS Courtyard and City Hall Vault Repair
- 09-27DS RFP Lease of Endion Station
- 09-4401 DAA - Replacement Terminal Area Development Landside Site - Phase 1
- 09-4402 DAA Runway 3-21 Pavement Rehabilitation, A4 Pavement Removal, and Taxiway Lighting
- 09-4403 DAA - Passenger Boarding Bridge - Replacement at Gate 1 and 4
- 09-4404 DAA North Business Development Area
- 09 4404 Invitation To Bid
- BID TAB 09.10.09
- NBDA Addenda No. 1
- NBDA Addunda No. 2
- Half pdf
- C400 C400
- C401 C401
- C402 C402
- C403 C403
- C404 C404
- C405 C405
- C406 C406
- C407 C407
- C408 C408
- C503 C503
- C504 C504
- C506 C506
- C507 C507
- C600 C600
- C601 C601
- C602 C602
- DLH C002
- DLH C003
- DLH C004
- DLH C005
- DLH C006
- DLH C100
- DLH C101
- DLH C200
- DLH C201
- DLH C202
- DLH C203
- DLH C204
- DLH C205
- DLH C300
- DLH C301
- DLH C302
- DLH C500
- DLH C501
- DLH C502
- DLH C505
- DLH C700
- DLH C701
- DLH C702
- DLH C800
- DLH C801
- DLH C802
- DLH C803
- DLH CS1
- DLH CS10
- DLH CS11
- DLH CS12
- DLH CS13
- DLH CS2
- DLH CS3
- DLH CS4
- DLH CS5
- DLH CS6
- DLH CS7
- DLH CS8
- DLH CS9
- DLH E001
- DLH E100
- DLH E101
- DLH E301
- DLH E302
- DLH E303
- DLH E304
- DLH E305
- DLH E400
- DLH ED100
- NBDA HALF SIZE PLAN SET
- Copy of 122908 Specs
- Part 1 - Title, TOC, S&S
- Part 10 - Special Provisions
- Part 11 Appendix-geotech report
- Part 2 - Bid Information
- Part 3 - Proposal Forms
- #10 Genspecs82802
- #11 Noncollusion
- #12 AIA%20Bid%20Bond.Rtf
- #13 Data For Labor Cost Bidding.Wpd
- #14 Heavy 081409.Doc
- #14 Highway 081409.Doc
- #14 Prevailing Wage Statements Combined
- #14 State Region01
- #15 Truckrentalrate0609
- #16 2009 2010 DBE Program
- #17 Ic134
- #18 Request To Sublet
- #19 ONECALL
- #20 Certification Regarding Lobbying
- #21 Contract.Doc
- #7 Bid Form
- #7A Schedule Of Values
- #8 Bidder Certifications.Doc
- #9 Notice To Bidders CITY Projects
- Part 4 - General Provisions
- Part 5 - EDA Contracting Provisions
- Part 6 - Supplementary General Conditions
- Part 7 - Safety & Security
- Part 8 - Special Conditions
- Part 9 - Technical Specifications
- 01 New RS&H P 100 Mobilization 01 26 06
- 010 New FAA 10D P 401 Plant Mix Bituminous Pavements 07 09 09
- 011 10B P 501 Portland Cement Concrete 3.26.08
- 012 New FAA 10D P 603 Bituminous Tack Coat 07 10 09
- 013 New FAA 10B P 610 Structural Concrete 06 22 06
- 014 BQK Airfield Drainage Bid Doc P 620 04 23 09
- 015 New FAA 10B F 162 Chain Link Fence 08 22 06
- 016 New FAA 10B T 905 Topsoiling 03 26 08
- 017 L 100 General Provisions
- 018 L 104 General Elec Safety Reqs
- 019 L 105 Alterations Removal And Demo
- 02 New RS&H P 102 Safety & Security 01 26 06
- 020 L 106 Submittals Record Documents
- 021 L 108 Underground Power Cable
- 022 L 110 Airport Underground Ducts
- 023 L 111 Airfld Ltg Sys Testing
- 024 L 121 Taxiway Lights And Bases
- 025 L 123 Airfield Signage Systems
- 026 L 131 Demonstrations Tests And Verification
- 03 New RS&H P 104 Survey & Stakeout 01 27 06
- 04 New RS&H P 107 Pavement Demolition 03 26 08
- 05 New RS&H P 109 Sawcutting 03 26 08
- 06 New FAA 10D P 151 Clearing & Grubbing 07 08 09
- 07 New FAA 10B P 152 Unclassified Excavation 03 26 08
- 08 New FAA 10D P 154 Subbase 07 09 09
- 09 New FAA 10D P 209 Crushed Agg Base 07 09 09
- 2008 RFPs and Bids
- 08-10DS Skywalk Extension
- 08-15DS Pump House Heating - Lakewood
- 08-16DS Central Entrance - Miller Hill Market Study
- 08-0552 Fire Station No. 10 Renovations
- 08-0664 (0743SN) Lift Station No. 6 Pump Replacement